Recovery of Expenses and other Charges for providing Electric Line or Plant for Supply (Revision-II) Regulations, 2022
Madhya Pradesh Electricity Regulatory Commission (Recovery of Expenses and other Charges for providing Electric Line or Plant used for the purpose of giving Supply) (Revision-II) Regulations, 2022
RegulationDated 31 May 2022No. 1165/ MPERC/2022 dated 31st May 2022
3 amendments to it are on Voltaic, the latest dated 13 Oct 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MPERC's second revision of the regulations governing what a distribution licensee in Madhya Pradesh may recover from applicants and consumers for building the electric line and plant needed to give them supply. It was issued in Bhopal on 31 May 2022 and comes into force on Gazette publication, with a savings proviso for applicants who already paid under the 2009 Revision-I (p1).
Chapters I–III (p1–6) set the title, applicability to all distribution licensees in their licensed areas, definitions (applicant, distribution main, service line, EHT/HT/LT voltage bands, multi-user complex, industrial park, slum and illegal colony) and general principles: charges recoverable in advance, connection only on full payment, treatment of load enhancement, and ownership of consumer-funded network vesting in the licensee.
Chapter IV (p7–21) is the operative core, splitting recovery by consumer category: individual LT domestic and domestic multi-user complexes/colonies; other LT consumers including non-domestic, EV charging, industrial, water works, street lights and agriculture; all EHT/HT consumers; and special situations — un-electrified residential colonies, slum areas, declared and undeclared illegal colonies, and conversion of LT connections above 150 HP to HT. For each it specifies what infrastructure the applicant bears, what the licensee funds, supervision-charge options, and where infrastructure cost is shared among groups of applicants.
Chapter V (p21) with Annexure I (p23–26) covers other recoverable charges — meter and plant rent, testing, shifting, disconnection/reconnection, name transfer, registration fees, dishonoured cheques and temporary supply. Chapter VI (p21–22) and Annexure II (p27) give miscellaneous powers, kW/kVA power-factor conversion factors, separate accounting of recovered amounts, consumer-contribution accounting treatment and the repeal and savings clause.
Read with this
Amendments and corrections
- Dated 27 Mar 2025Recovery of Expenses and Other Charges for Providing Electric Line or Plant (Revision-II) Regulations, 2022 — First Amendment, 2025
- Dated 13 Oct 2026Recovery of Expenses and Other Charges Regulations, 2022 (Revision-II) — Second Amendment, 2026
- Dated 13 Oct 2026Recovery of Expenses and Other Charges for Providing Electric Line or Plant (Revision-II) Regulations, 2022 — Second Amendment, 2026
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.