Recovery of Expenses and other Charges for providing Electric Line or Plant for Supply (Revision-II) Regulations, 2022

Madhya Pradesh Electricity Regulatory Commission (Recovery of Expenses and other Charges for providing Electric Line or Plant used for the purpose of giving Supply) (Revision-II) Regulations, 2022

RegulationDated 31 May 2022No. 1165/ MPERC/2022 dated 31st May 2022

3 amendments to it are on Voltaic, the latest dated 13 Oct 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MPERC's second revision of the regulations governing what a distribution licensee in Madhya Pradesh may recover from applicants and consumers for building the electric line and plant needed to give them supply. It was issued in Bhopal on 31 May 2022 and comes into force on Gazette publication, with a savings proviso for applicants who already paid under the 2009 Revision-I (p1).

Chapters I–III (p1–6) set the title, applicability to all distribution licensees in their licensed areas, definitions (applicant, distribution main, service line, EHT/HT/LT voltage bands, multi-user complex, industrial park, slum and illegal colony) and general principles: charges recoverable in advance, connection only on full payment, treatment of load enhancement, and ownership of consumer-funded network vesting in the licensee.

Chapter IV (p7–21) is the operative core, splitting recovery by consumer category: individual LT domestic and domestic multi-user complexes/colonies; other LT consumers including non-domestic, EV charging, industrial, water works, street lights and agriculture; all EHT/HT consumers; and special situations — un-electrified residential colonies, slum areas, declared and undeclared illegal colonies, and conversion of LT connections above 150 HP to HT. For each it specifies what infrastructure the applicant bears, what the licensee funds, supervision-charge options, and where infrastructure cost is shared among groups of applicants.

Chapter V (p21) with Annexure I (p23–26) covers other recoverable charges — meter and plant rent, testing, shifting, disconnection/reconnection, name transfer, registration fees, dishonoured cheques and temporary supply. Chapter VI (p21–22) and Annexure II (p27) give miscellaneous powers, kW/kVA power-factor conversion factors, separate accounting of recovered amounts, consumer-contribution accounting treatment and the repeal and savings clause.

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Supply to buildings and colonies

Read with this

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.