MPERC · Madhya Pradesh Electricity Regulatory Commission

Recovery of Expenses and Other Charges for Providing Electric Line or Plant (Revision-II) Regulations, 2022 — First Amendment, 2025

Madhya Pradesh Electricity Regulatory Commission (Recovery of expenses and other charges for providing electric line or plant used for the purpose of giving supply) (Revision-II) Regulations, 2022 (First amendment) {ARG-31(II)(i) of 2025}

AmendmentDated 27 Mar 2025No 571/MPERC/2025 dated 27.03.2025

Amends the Recovery of Expenses and other Charges for providing Electric Line or Plant for Supply (Revision-II) Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the First Amendment to MPERC's Revision-II 2022 regulations on recovery of expenses and other charges for providing electric line or plant used for giving supply. Issued as Notification No 571/MPERC/2025 dated 27.03.2025 under s.181 read with s.45(3)(b) and s.46 of the Electricity Act, it takes effect from Gazette publication, which the text does not date (p1).

Section 2 rewrites the Principal Regulations' definitions: it adds a 'Consumer' definition broken into LT, HT and EHT categories by voltage of supply, defines 'Electrified area' by presence of a distribution system in the vicinity of applicants, ties 'Sanctioned load' to the MP Electricity Supply Code, 2021, and replaces 'Connected load' with 'Sanctioned load/Contract demand, as the case may be' (p1–2).

Section 3 reworks how charges are levied: recovery in advance before service, conversion of load between kW and kVA at fixed power factors for LT and HT, an incremental-charge formula for load enhancement, full higher-voltage charges on voltage switchover, and load estimation/limits governed by the Supply Code (p2–3).

Section 4 is the core. It inserts alternative per-kW Supply Affording Charges schedules that an applicant in an electrified area may pay instead of actual-cost recovery, covering several connection/load-size bands and giving BPL applicants their own slabs; sets who bears Distribution Transformer and HT line extension cost above and below a 50 kW threshold, with EV charging stations exempted; allows applicants to lay HT lines themselves against supervision charges; and restates load estimation for non-domestic, industrial and multi-consumer complexes (p3–7).

Section 5 adds an entry to the Annexure I Schedule of Other Charges for check power quality meter rent/installation, with the amount to be issued separately by order (p7).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes

Read with this

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document