Haryana Electricity Regulatory Commission (Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering) Regulations, 2021 (2nd Amendment) Regulations, 2025

AmendmentDated 30 Oct 2025Published in the Gazette 11 Nov 2025Regulation No. HERC/54/2nd Amendment/2025 dated The 30th October, 2025

Amends the Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page Haryana Gazette notification in which the Haryana Electricity Regulatory Commission amends its 2021 Rooftop Solar Grid Interactive Systems (Net Metering/Gross Metering) Regulations for the second time (p1). It was notified on 30 October 2025 and takes effect from Gazette publication, printed as 11 November 2025 (p1).

Clause 1 gives the short title and commencement (p1). Clause 2 replaces the definition of "settlement period" in the principal regulations with a fixed annual window running from 1 October to 30 September of the following year, and provides that for a newly commissioned rooftop solar system the first settlement period runs only from the date of commissioning to the following 30 September (p1). This converts the accounting cycle from a rolling one to a uniform October–September year.

Clause 3 reworks energy accounting under Regulation 11. Sub-clause 3.1 deletes Regulation 11.1(a) outright (p1). Sub-clause 3.2 replaces Regulation 11.1(g), so that unadjusted net credited units left at the end of a settlement period are treated as units purchased by the distribution licensee at 90% of the feed-in tariff set out in Regulation 11(iii)(b) of the principal regulations, with a proviso that the cumulative quantum of injected electricity carried forward is reset to zero each October (pp1–2). Sub-clause 3.3 replaces Regulation 11.6, applying the same 90%-of-feed-in-tariff compensation to an eligible consumer who leaves the system and has unused credits for excess generation (p2).

The document changes only these provisions; it creates no new forms or procedures and states no transitional or savings clause for credits accrued before commencement.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document