Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering Regulations, 2021 — 1st Amendment, 2024

The Haryana Electricity Regulatory Commission (Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering), Regulations, 2021 (1st Amendment) Regulation, 2024

AmendmentDated 15 Jul 2024Regulation No. HERC/54/2021/1st Amendment/2024 dated The 15th July, 2024

Amends the Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HERC's first amendment to its 2021 Rooftop Solar Grid Interactive Systems (Net Metering/Gross Metering) Regulations, notified 15 July 2024 (p1). Clause 1 folds the amendment into the 2021 Regulations, brings it into force on publication in the Haryana Government Gazette, and extends it to the whole of Haryana (p1); the Gazette date is not printed, so the operative date cannot be fixed from this document alone.

Clause 2 rewrites two limbs of Regulation 14.2 on application processing (p1). The proviso to 14.2(c) is substituted so that complete applications for rooftop PV systems "upto 10 kW capacity" are deemed accepted without a technical feasibility study, the distribution licensee being required to carry out any sanctioned-load enhancement that follows. Sub-clause 14.2(d) is substituted with a 15-day outer limit, running from acknowledgement of the application, for the licensee to report deficiencies via Format 2(a) by email/SMS — failing which the proposal is presumed technically feasible.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, New connections and load changes

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document