Skip to content

MSERC · Meghalaya State Electricity Regulatory Commission

Terms and Conditions of Green Energy Open Access Regulations, 2023

Meghalaya State Electricity Regulatory Commission (Terms and Conditions of Green Energy Open Access) Regulations, 2023

RegulationDated 9 May 2024No. MSERC/Green Tariff/Regn/2023/01 dated 9th May 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Meghalaya State Electricity Regulatory Commission's principal regulation for green energy open access, issued by Notification No. MSERC/Green Tariff/Regn/2023/01 dated 9 May 2024. Regulation 1 states it comes into force on Gazette notification, applies to the whole State, and Regulation 2 gives its purpose: laying down a methodology for determining open access charges and banking charges for green energy open access consumers (p1).

Chapter 1 (p1–4) is preliminary — the short title, objective, definitions and scope. The definitions cover banking and banking cycle, green energy, green energy open access consumer, fossil fuel, renewable energy sources, the open access durations, standby charges and wheeling; Regulation 4 confines the regulation to use of the intra-state transmission and/or distribution system for green energy, including non-fossil waste-to-energy (p4).

Chapter 2 (p5–9) covers open access generally. It sorts consumers into long-term, medium-term and short-term categories by duration (p5), sets the eligibility threshold and voltage-linked ceilings on open access capacity (p5–6), and adds conditions on minimum daily time blocks, independent feeders, group applications, communication and metering, plus bars for defaulters (p6–7). It designates the central and state nodal agencies by duration and voltage level (p8), requires a detailed procedure and application formats to be filed with the Commission within 30 days and applications decided within 15 days with deemed approval, sets out first-in-first-out processing, curtailment priority for non-fossil sources, and appeal to the Commission within 30 days with disposal in three months (p8–9). Green Energy Certificates are to be issued yearly (p9).

Chapter 3 (p10–15) is the charging chapter. Regulation 10 lists the heads of charge, and Regulations 11 to 17 specify each: transmission and wheeling charges, cross-subsidy surcharge, additional surcharge, standby charges, banking charges and other SLDC/scheduling/DSM charges, with the treatment of dedicated systems, exemptions and loss elements; Regulation 18 routes collection and disbursement through the State Nodal Agency (p15).

Chapter 4 (p16) holds the enabling clauses — directions, power to relax, amend and remove difficulties, and final interpretation by the Commission.

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access charges, Energy banking

Read with this

One more document belongs here and is not on Voltaic: a procedure or order made under it not held as English text.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document