Summary
Summary written by software. Check the regulator's original before you rely on it.
The Meghalaya State Electricity Regulatory Commission issued these Regulations on 3 April 2024 under notification No. MSERC/Green Tariff/Regn/2023/01 (p1). They extend to the whole of Meghalaya and come into force from the date of notification in the Meghalaya Official Gazette, a date the document does not print (p1). The stated objective is to provide a methodology for determining open access charges and banking charges for green energy open access consumers (p1). The Commission describes the exercise as making "previous publication" of the Regulations (p1).
Chapter 1 (Regulations 1–4, p1–4) is preliminary: the defined terms used throughout, and scope — open access for electricity from green energy sources, including non-fossil-fuel waste-to-energy, over the intra-state transmission and/or distribution system where incidental to inter-state transmission (p4).
Chapter 2 (Regulations 5–9, p5–9) covers general open access provisions: categorisation by duration into long-, medium- and short-term; eligibility built on a 100 kW threshold, voltage-linked capacity bands, group applications on an independent feeder, and disqualifications; operating conditions on time-block scheduling, drawl limits, communication and metering; allocation of nodal agency functions among SLDC, the distribution licensee, the STU and POSOCO; the application route through the Central Nodal Agency portal with a deemed-approval timeline, priority and curtailment rules, and appeals to the Commission; and yearly Green Energy Certificates (p9).
Chapter 3 (Regulations 10–18, p10–15) is the charging framework: the charge heads payable — transmission, wheeling, cross-subsidy surcharge, standby, banking and other fees — most of them left to be determined by the Commission in transmission and retail supply tariff orders or by the Central Commission for inter-state transmission; cost-sharing for dedicated systems; applicability of transmission and wheeling losses; exempt categories and ceilings on the two surcharges; standby arrangement and its charge basis; in-kind banking with a banking cycle, Time-of-Day credit and drawal rules, year-end reconciliation and lapse of unutilised energy; and collection and disbursement through the State Nodal Agency (p15).
Chapter 4 (Regulations 19–23, p16) is miscellaneous: directions, relaxation, amendment, removal of difficulties and final interpretation by the Commission.
Read with this
The regulation
Earlier drafts
- Dated 28 Sep 2023Draft Green Energy Open Access Regulations, 2023 — Discussion Paper
One more document belongs here and is not on Voltaic: a procedure or order made under it not held as English text.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.