Terms and Conditions of Green Energy Open Access Regulations, 2023

Meghalaya State Electricity Regulatory Commission (Terms and Conditions of Green Energy Open Access) Regulations, 2023

Draft regulationDated 3 Apr 2024No. MSERC/Green Tariff/Regn/2023/01 dated 3rd April 2024

Draft

A proposal that has since been finalised as the Terms and Conditions of Green Energy Open Access Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Meghalaya State Electricity Regulatory Commission issued these Regulations on 3 April 2024 under notification No. MSERC/Green Tariff/Regn/2023/01 (p1). They extend to the whole of Meghalaya and come into force from the date of notification in the Meghalaya Official Gazette, a date the document does not print (p1). The stated objective is to provide a methodology for determining open access charges and banking charges for green energy open access consumers (p1). The Commission describes the exercise as making "previous publication" of the Regulations (p1).

Chapter 1 (Regulations 1–4, p1–4) is preliminary: the defined terms used throughout, and scope — open access for electricity from green energy sources, including non-fossil-fuel waste-to-energy, over the intra-state transmission and/or distribution system where incidental to inter-state transmission (p4).

Chapter 2 (Regulations 5–9, p5–9) covers general open access provisions: categorisation by duration into long-, medium- and short-term; eligibility built on a 100 kW threshold, voltage-linked capacity bands, group applications on an independent feeder, and disqualifications; operating conditions on time-block scheduling, drawl limits, communication and metering; allocation of nodal agency functions among SLDC, the distribution licensee, the STU and POSOCO; the application route through the Central Nodal Agency portal with a deemed-approval timeline, priority and curtailment rules, and appeals to the Commission; and yearly Green Energy Certificates (p9).

Chapter 3 (Regulations 10–18, p10–15) is the charging framework: the charge heads payable — transmission, wheeling, cross-subsidy surcharge, standby, banking and other fees — most of them left to be determined by the Commission in transmission and retail supply tariff orders or by the Central Commission for inter-state transmission; cost-sharing for dedicated systems; applicability of transmission and wheeling losses; exempt categories and ceilings on the two surcharges; standby arrangement and its charge basis; in-kind banking with a banking cycle, Time-of-Day credit and drawal rules, year-end reconciliation and lapse of unutilised energy; and collection and disbursement through the State Nodal Agency (p15).

Chapter 4 (Regulations 19–23, p16) is miscellaneous: directions, relaxation, amendment, removal of difficulties and final interpretation by the Commission.

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access charges, Energy banking

Read with this

One more document belongs here and is not on Voltaic: a procedure or order made under it not held as English text.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document