Meghalaya Framework for Resource Adequacy Regulations, 2023

Meghalaya State ElectricityRegulatoryCommission (Framework for Resource Adequacy) Regulations, 2023.

Draft regulationDated 12 Apr 2024MSERC/RA-REG/2023/01 dated 12th April 2024

Draft

A proposal that has since been finalised as the Meghalaya Framework for Resource Adequacy Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

MSERC issued this document for previous publication as the Meghalaya State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2023, under notification No. MSERC/RA-REG/2023/01 dated 12 April 2024. It is not yet notified: the Commission invites suggestions within 21 days of the notice before publication, and the Regulations are to come into force from the date of Gazette notification (p2).

Chapter 1 (pp2–4) sets the title, extent to Meghalaya, commencement, objective, scope and definitions, including planning horizons and resource adequacy metrics. It applies to generating companies, distribution licensees, SLDC, STU and other grid-connected entities and stakeholders in the State (p3). Chapter 2 (pp4–5) describes the resource adequacy framework as demand assessment and forecasting, generation resource planning, procurement planning, and monitoring/compliance; distribution licensees must prepare MT-DRAP and ST-DRAP.

Chapter 3 (pp5–7) assigns demand and energy forecasting to distribution licensees by consumer category and area, with listed methodologies, scenario analysis and state-level aggregation by STU/SLDC for submission to the Authority and NLDC/RLDC. Chapter 4 (pp8–11) covers generation resource planning: resource mapping, capacity crediting (including a net-load-based method for wind and solar, and resource-specific treatment for hydro and thermal), planning reserve margin based on reliability indices, and identification of the resource gap and RA allocation. Chapter 5 (pp11–13) addresses procurement planning: optimal resource mix, least-cost modelling, procurement type and tenure, annual rolling plans, and capacity sharing or trading. Chapter 6 (p13) deals with monitoring, reporting and non-compliance charges; Chapter 7 (pp13–14) sets data-sharing duties and annual timelines; Chapter 8 (pp14–15) gives the Commission powers to issue directions, relax provisions and remove difficulties.

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs

Read with this

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document