MSERC · Meghalaya State Electricity Regulatory Commission
Meghalaya Framework for Resource Adequacy Regulations, 2023
Meghalaya State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2023
RegulationDated 9 May 2024MSERC/RA-REG/2023/01 dated 9th May 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is Meghalaya's principal resource adequacy regulation, issued by MSERC under notification No. MSERC/RA-REG/2023/01 dated 9 May 2024, made under section 181 read with sections 61, 66 and 86 of the Electricity Act, 2003 (p2). It extends to the whole of Meghalaya and comes into force on the date of notification in the Official Gazette, which the text does not print (p2). It applies to generating companies, distribution licensees, the SLDC, the STU and other grid-connected entities in the State (p3).
Chapter 1 sets the objective and definitions, including what counts as medium term (ten years) and short term (five years) for forecasting and planning (p2–4). Chapter 2 frames the four steps of the framework — demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance — and requires the distribution licensee to prepare MT-DRAP and ST-DRAP (p4).
Chapter 3 specifies how demand is to be assessed and forecast: consumer-category load forecasts using named methodologies with a statistical selection test, adjustment for policies and demand drivers, loss trajectories, peak-demand derivation, scenario analysis, and an annual hourly/sub-hourly forecasting and aggregation cycle with submission deadlines running from the licensee to SLDC, STU, NLDC/RLDC and the Authority (p5–7). Chapter 4 governs generation resource planning: mapping contracted, upcoming and retiring resources with machine characteristics; computing Capacity Credit factors by a net-load method for RE, hydro and thermal resources; setting a planning reserve margin linked to reliability indices; and identifying the resource gap and RA requirement against national and state coincident peaks (p8–11). Chapter 5 covers procurement — optimal least-cost resource mix, tenure and regional optimisation, capacity sharing and trading, and annual rolling plans submitted for Commission approval (p11–13). Chapter 6 provides for monitoring, shortfall communication and non-compliance charges; Chapter 7 sets the data-sharing protocol and the annual timeline calendar; Chapter 8 gives the Commission powers to direct, relax and remove difficulties (p13–15).
Read with this
Earlier drafts
- Dated 13 Dec 2023Meghalaya Framework for Resource Adequacy Regulations, 2023 — Draft
- Dated 12 Apr 2024Meghalaya Framework for Resource Adequacy Regulations, 2023
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.