Skip to content

MSERC · Meghalaya State Electricity Regulatory Commission

Meghalaya Framework for Resource Adequacy Regulations, 2023

Meghalaya State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2023

RegulationDated 9 May 2024MSERC/RA-REG/2023/01 dated 9th May 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is Meghalaya's principal resource adequacy regulation, issued by MSERC under notification No. MSERC/RA-REG/2023/01 dated 9 May 2024, made under section 181 read with sections 61, 66 and 86 of the Electricity Act, 2003 (p2). It extends to the whole of Meghalaya and comes into force on the date of notification in the Official Gazette, which the text does not print (p2). It applies to generating companies, distribution licensees, the SLDC, the STU and other grid-connected entities in the State (p3).

Chapter 1 sets the objective and definitions, including what counts as medium term (ten years) and short term (five years) for forecasting and planning (p2–4). Chapter 2 frames the four steps of the framework — demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance — and requires the distribution licensee to prepare MT-DRAP and ST-DRAP (p4).

Chapter 3 specifies how demand is to be assessed and forecast: consumer-category load forecasts using named methodologies with a statistical selection test, adjustment for policies and demand drivers, loss trajectories, peak-demand derivation, scenario analysis, and an annual hourly/sub-hourly forecasting and aggregation cycle with submission deadlines running from the licensee to SLDC, STU, NLDC/RLDC and the Authority (p5–7). Chapter 4 governs generation resource planning: mapping contracted, upcoming and retiring resources with machine characteristics; computing Capacity Credit factors by a net-load method for RE, hydro and thermal resources; setting a planning reserve margin linked to reliability indices; and identifying the resource gap and RA requirement against national and state coincident peaks (p8–11). Chapter 5 covers procurement — optimal least-cost resource mix, tenure and regional optimisation, capacity sharing and trading, and annual rolling plans submitted for Commission approval (p11–13). Chapter 6 provides for monitoring, shortfall communication and non-compliance charges; Chapter 7 sets the data-sharing protocol and the annual timeline calendar; Chapter 8 gives the Commission powers to direct, relax and remove difficulties (p13–15).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs

Read with this

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document