MSERC · Meghalaya State Electricity Regulatory Commission
Meghalaya Framework for Resource Adequacy Regulations, 2023 — Draft
Meghalaya State ElectricityRegulatoryCommission (Framework for Resource Adequacy) Regulations, 2023
Draft regulationDated 13 Dec 2023MSERC/RA-REG/2023/ dated 13th December, 2023
Draft
A proposal that has since been finalised as the Meghalaya Framework for Resource Adequacy Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the consultation draft of the Meghalaya State Electricity Regulatory Commission's Resource Adequacy Framework Regulations, 2023, issued under notification dated 13 December 2023 (p2). It is proposed to be made under section 181 of the Electricity Act, 2003 read with sections 61, 66 and 86 (p2), extends to the whole of Meghalaya, and takes effect from the date of notification in the Official Gazette (p2). Its stated objective is a planning mechanism — demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance — that keeps projected demand served within specified reliability standards and at optimum generation mix (p2, p4).
Chapters 1 and 2 (pp2–5) set out title, extent, commencement, objective, scope, definitions and the four-step framework. The operative duties fall mainly on the distribution licensee, which must prepare a Medium-Term Distribution Resource Adequacy Plan (five years) and a Short-Term Distribution Resource Adequacy Plan (one year) (p4–5).
Chapter 3 (pp5–8) governs demand assessment: consumer-category level forecasting with permitted methodologies and statistical selection tests, mandated policy and demand-side driver trajectories, sensitivity scenarios, loss and peak-demand adjustments, and the annual forecast submission chain from licensee to SLDC to the Authority, NLDC and RLDC.
Chapter 4 (pp8–11) covers generation resource planning — mapping contracted, upcoming and retiring resources with machine-level technical characteristics, computing capacity credit (including a prescribed net-load method for wind and solar), setting a planning reserve margin against reliability indices, and deriving the resource gap and resource adequacy requirement, with Commission approval of the plans.
Chapter 5 (pp11–12) deals with procurement: least-cost optimal resource mix, region-first sequencing, contract tenure, annual rolling plans and inter-state capacity sharing. Chapters 6 to 8 (pp13–15) cover monitoring, non-compliance charges for RA shortfalls, data-sharing duties and annual timelines, and the Commission's powers to direct, relax and remove difficulties. No schedules or formats are attached.
Read with this
The regulation
- Dated 9 May 2024Meghalaya Framework for Resource Adequacy Regulations, 2023
Earlier drafts
- Dated 12 Apr 2024Meghalaya Framework for Resource Adequacy Regulations, 2023
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.