Intra-State Transmission TBCB Threshold Limit Regulations, 2024 — Introduction — Draft
Introduction to Draft Delhi Electricity Regulatory Commission (Threshold Limit for the Development of Intra-State Transmission Projects under the Tariff Based Competitive Bidding) Regulations, 2024
Published with a draftReleased with the notice dated 29 Aug 2024
Draft
Voltaic holds no final regulation made from this draft.
Published with the Threshold Limit for Intra-State Transmission Projects under TBCB Regulations, 2024 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Two pages of explanatory introduction to a proposed DERC regulation that would set the threshold limit above which intra-state transmission projects in Delhi must be developed through Tariff Based Competitive Bidding (TBCB) (p1–2).
It opens with the Commission's existing framework: the DERC (Terms and Conditions for Determination of Tariff) Regulations, 2017, gazetted on 31.01.2017, and the DERC (Business Plan) Regulations, 2023, which cover the approach, framework, procedure, filings and principles for determining transmission tariff and whose Clause 16(i) already contemplates developing intra-state transmission projects through a bidding process (p1).
It then recites the legal drivers. The Supreme Court, in its judgment of 23 November 2022 in Tata Power v MERC, directed all SERCs to frame regulations under s.181 on terms and conditions for tariff determination, guided by the s.61 principles and by the National Electricity Policy and Tariff Policy (p1). The Tariff Policy 2016 continues competitive bidding for Central Government owned or controlled generation and transmission projects and requires intra-state transmission projects to be developed by the State Government through competitive bidding above a threshold to be decided by the SERC (p1). Two Ministry of Power letters are cited — 15 March 2021 recommending TBCB for intra-state transmission systems, and 21 August 2023 asking SERCs to notify the threshold limit (p1).
The closing paragraph gives the rationale: fostering competition, minimising intra-state transmission tariff to consumers' advantage, alignment with national TBCB experience, MoP guidelines, thresholds set by other SERCs and the STU's investment portfolio, and attracting private investment that relieves state utilities of financial burden (p2).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 29 Aug 2024Threshold Limit for Intra-State Transmission Projects under TBCB Regulations, 2024 — Draft
- Dated 29 Aug 2024Public notice: Public Notice — Draft Threshold Limit for Intra-State Transmission Projects under Tariff Based Competitive Bidding Regulations, 2024
- Dated 29 Aug 2024Corrigendum: Draft Intra-State Transmission TBCB Threshold Regulations, 2024 — Public Notice
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.