DERC · Delhi Electricity Regulatory Commission

Threshold Limit for Intra-State Transmission Projects under TBCB Regulations, 2024 — Draft

Delhi Electricity Regulatory Commission (Threshold Limit for the Development of Intra-State Transmission Projects under Tariff Based Competitive Bidding) Regulations, 2024

Draft regulationDated 29 Aug 2024F. 17(334)/DERC/Engg./2024-25/8169 dated 29th August 2024

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a DERC regulation, headed as a Draft, issued in Delhi on 29 August 2024 under F.17(334)/DERC/Engg./2024-25/8169. It is made under clauses (zd), (zf) and (zp) of Section 181(2) read with Sections 61, 63 and 86(4) of the Electricity Act, 2003 (p1). The heading calls it 'Draft ... Regulations, 2024' although the body states the Commission 'hereby makes the following Regulations' (p1).

Part 1, Preliminary (regs 1–2, pp1–2), sets the short title, commencement from Gazette publication, and extent, and defines the Act, Bid Process Coordinator, Commission, Control Period, Empowered Committee, Guidelines for competitive bidding, Financial Year, New Intra State Transmission Projects, Project, STU and TBCB. The definition of new intra-state transmission projects excludes upgradation or augmentation of existing transmission licensee or STU assets and deposit works funded under consumer contribution (p2).

Regulation 3 (pp2–3) fixes the threshold limit at above Rupees one hundred and fifty (150) Crores excluding land cost for new intra-state transmission projects to be awarded under tariff-based competitive bidding. New intra-state transmission projects above that threshold, formulated by the STU and approved by the Commission, are to be implemented through TBCB by Bid Process Coordinators, following Empowered Committee recommendations and central competitive-bidding guidelines. The threshold applies to all new projects for which Commission approval is yet to be accorded (p2). Entire independent transmission projects, including upstream and downstream projects, must be designed as a single project for bidding (p2). Exceptions allow the STU to use cost-plus under Section 62 above the threshold for critical projects such as Defence, Railways or Airport, or for ownership-interface issues, with prior Commission approval; below-threshold projects may go to TBCB with prior approval and valid reasons (pp2–3).

Regulations 4–7 (p3) give the Commission powers to relax or waive provisions after reasons and a hearing, issue orders and practice directions, remove difficulties, and amend the regulations. No repeal, savings, schedule or transitional provisions are stated.

Primary topics
Competitive bidding

Read with this

Voltaic holds no final regulation made from this draft.

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.