Skip to content

DERC · Delhi Electricity Regulatory Commission

Draft Intra-State Transmission TBCB Threshold Regulations, 2024 — Public Notice

Inviting comments/suggestions/objections on Draft Delhi Electricity Regulatory Commission (Threshold Limit for the Development of Intra-State Transmission Projects under the Tariff Based Competitive Bidding) Regulations, 2024

Corrigendum to a draftDated 29 Aug 2024

Draft

Voltaic holds no final regulation made from this draft.

Corrigendum to the Threshold Limit for Intra-State Transmission Projects under TBCB Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Delhi Electricity Regulatory Commission issued this public notice on 29 August 2024 to open stakeholder consultation on a draft regulation that would fix a threshold limit above which intra-state transmission projects are to be developed through tariff-based competitive bidding (p1).

The notice names the draft instrument — the DERC (Threshold Limit for the Development of Intra-State Transmission Projects under the Tariff Based Competitive Bidding) Regulations, 2024 — recites the Commission's enabling powers under the Electricity Act, 2003, and points readers to the draft on the Commission's website (p1).

It sets the consultation mechanics rather than any substantive norm: comments, suggestions and objections must reach the Secretary, DERC by 1700 hrs on 30 September 2024, either by post or by email. The operative threshold and bidding requirements sit in the draft regulation itself, not in this notice (p1).

Primary topics
Competitive bidding

Read with this

Voltaic holds no final regulation made from this draft.

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document