KERC · Karnataka Electricity Regulatory Commission

Ancillary Services Regulations, 2025

Karnataka Electricity Regulatory Commission (Ancillary Services) Regulations, 2025

RegulationDated 15 Jul 2025No. KERC/S/F-31/Vol-1402/504 dated 15.07.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is KERC's principal framework for buying, despatching and paying for ancillary services inside Karnataka's intra-State grid. Pages 1–2 are the preamble and the approving Order: the Commission explains why reserves must be held within the State's control area, lists its objectives (grid security, transparency, competitive market for AS), records that the draft 2024 regulations were gazetted on 07.01.2025 and a public hearing held on 19.03.2025, and signs off the 2025 Regulations. The operative text starts on p3 and takes effect from gazette publication, a date not printed in the document.

Chapters 1–4 (pp3–7) cover short title and commencement, the objective of holding frequency near 50 Hz and relieving intra-State congestion, 28 definitions (PRAS/SRAS/TRAS, AGC, ACE, URS, energy storage, demand response and more), and applicability to intra-State entities able to provide AS.

Chapter 5 (pp7–17) is the substance. Regulation 6 makes the SLDC, as Nodal Agency, responsible for estimating State-level reserve requirements. Part I (Regs 7–13, pp8–13) governs SRAS: eligibility conditions for providers, the events and ACE threshold that trigger activation, two control modes, procurement through standing consent and monthly declarations of energy or compensation charges, merit-order despatch by automatic 4-second signals, 15-minute block payment through the SDSMA, performance monitoring and disqualification. Part II (Reg 14, pp13–14) handles shortfall and emergency conditions by deeming Section 62 stations, including those holding un-requisitioned capacity, available to the Nodal Agency. Part III (Regs 15–16, pp14–15) sets weekly accounting and settlement and waives transmission charges and losses on SRAS. Part IV (Regs 17–18 and the closing provision, pp15–17) requires the Nodal Agency to bring a Detailed Procedure for Commission approval within three months, and gives the Commission power to relax provisions and issue directions.

Standard name
Ancillary Services Regulations
Primary topics
Ancillary services and reserves, Scheduling and despatch, Energy accounting and settlement

Read with this

Other copies of these documents (1)

Earlier drafts

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document