KERC · Karnataka Electricity Regulatory Commission

Ancillary Services Regulations, 2025

Karnataka Electricity Regulatory Commission (Ancillary Services) Regulations, 2025

Regulation · Gazette copyDated 15 Jul 2025No. KERC/S/F-31/Vol-1402/504 dated 15.07.2025

The Gazette copy of the Ancillary Services Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

KERC issued the Karnataka Electricity Regulatory Commission (Ancillary Services) Regulations, 2025 by notification dated 15.07.2025 (p1). The regulations create a State-level framework for procuring, deploying and paying for ancillary services, with the State Load Despatch Centre as Nodal Agency (p5). The preamble explains objectives: grid reliability, transparency, innovation and a competitive ancillary services market, and lists stakeholders—generators, distribution utilities, transmission companies and open access consumers (p1).

Chapter 1 (p3) names the regulations and makes them effective from publication in the Karnataka official gazette. Chapter 2 (p3) states the objective: maintain reserves within the State control area, keep frequency near 50 Hz, restore frequency within KEGC limits, and address intra-State transmission congestion. Chapter 3 (pp3–6) defines ancillary service categories and operational terms such as ACE, AGC, PRAS, SRAS, TRAS, SRAS-Up/Down, Nodal Agency, SDSMA and URS.

Chapter 4 (p7) applies the regulations to intra-State entities, including energy storage and demand-response resources. Chapter 5 (pp7–16) is the operational framework. It lists PRAS, SRAS, TRAS and any other KEGC services, but provides the detailed mechanism only for SRAS (p7). The Nodal Agency must estimate and publish SRAS requirements, reassess day-ahead and real-time (p7). Part I (pp8–13) sets SRAS provider eligibility—bi-directional communication, AGC enablement, minimum 10 MW response, SCADA/metering, and response/sustain capability—and the activation trigger based on State ACE threshold, with a formula and choice of tie-line bias or flat tie-line control (pp8–9). It covers procurement through standing consent, merit-order selection, automatic despatch by secondary control signals every 4 seconds, payment from SDSMA for SRAS-Up and payback for SRAS-Down, performance monitoring, and disqualification for poor performance (pp9–13). Part II (pp13–14) treats shortfall or emergency conditions, deeming Section 62 generating stations available and providing compensation. Part III (pp14–15) provides weekly accounting and settlement through SDSMA and says no transmission charges, losses or deviation charges apply for SRAS. Part IV (pp15–16) requires the Nodal Agency to submit a Detailed Procedure for approval within three months, with public consultation, and gives the Commission power to relax provisions and remove difficulties.

Standard name
Ancillary Services Regulations
Primary topics
Ancillary services and reserves, Scheduling and despatch, Energy accounting and settlement

Read with this

The regulation

Earlier drafts

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document