KERC · Karnataka Electricity Regulatory Commission
Ancillary Services Regulations, 2025
Karnataka Electricity Regulatory Commission (Ancillary Services) Regulations, 2025
Regulation · Gazette copyDated 15 Jul 2025No. KERC/S/F-31/Vol-1402/504 dated 15.07.2025
The Gazette copy of the Ancillary Services Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
KERC issued the Karnataka Electricity Regulatory Commission (Ancillary Services) Regulations, 2025 by notification dated 15.07.2025 (p1). The regulations create a State-level framework for procuring, deploying and paying for ancillary services, with the State Load Despatch Centre as Nodal Agency (p5). The preamble explains objectives: grid reliability, transparency, innovation and a competitive ancillary services market, and lists stakeholders—generators, distribution utilities, transmission companies and open access consumers (p1).
Chapter 1 (p3) names the regulations and makes them effective from publication in the Karnataka official gazette. Chapter 2 (p3) states the objective: maintain reserves within the State control area, keep frequency near 50 Hz, restore frequency within KEGC limits, and address intra-State transmission congestion. Chapter 3 (pp3–6) defines ancillary service categories and operational terms such as ACE, AGC, PRAS, SRAS, TRAS, SRAS-Up/Down, Nodal Agency, SDSMA and URS.
Chapter 4 (p7) applies the regulations to intra-State entities, including energy storage and demand-response resources. Chapter 5 (pp7–16) is the operational framework. It lists PRAS, SRAS, TRAS and any other KEGC services, but provides the detailed mechanism only for SRAS (p7). The Nodal Agency must estimate and publish SRAS requirements, reassess day-ahead and real-time (p7). Part I (pp8–13) sets SRAS provider eligibility—bi-directional communication, AGC enablement, minimum 10 MW response, SCADA/metering, and response/sustain capability—and the activation trigger based on State ACE threshold, with a formula and choice of tie-line bias or flat tie-line control (pp8–9). It covers procurement through standing consent, merit-order selection, automatic despatch by secondary control signals every 4 seconds, payment from SDSMA for SRAS-Up and payback for SRAS-Down, performance monitoring, and disqualification for poor performance (pp9–13). Part II (pp13–14) treats shortfall or emergency conditions, deeming Section 62 generating stations available and providing compensation. Part III (pp14–15) provides weekly accounting and settlement through SDSMA and says no transmission charges, losses or deviation charges apply for SRAS. Part IV (pp15–16) requires the Nodal Agency to submit a Detailed Procedure for approval within three months, with public consultation, and gives the Commission power to relax provisions and remove difficulties.
Read with this
The regulation
- Dated 15 Jul 2025Ancillary Services Regulations, 2025
Earlier drafts
- Dated 1 Jan 2025Ancillary Services Regulations, 2024 — Draft
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.