KERC · Karnataka Electricity Regulatory Commission
Ancillary Services Regulations, 2024 — Draft
Karnataka Electricity Regulatory Commission (Ancillary Services) Regulations, 2024
Draft regulationDated 1 Jan 2025No. KERC/S/F-31/Vol-1402/1251 dated 01.01.2025
Draft
A proposal that has since been finalised as the Ancillary Services Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Karnataka Electricity Regulatory Commission's draft Ancillary Services Regulations, 2024, issued as a notification dated 01.01.2025 (No. KERC/S/F-31/Vol-1402/1251) so that stakeholders can comment before it is finalised — it is a draft, not a settled regulation (p1–3). The notification explains why ancillary services are needed in a renewables-heavy grid, states that the regulations will apply to all stakeholders in the electricity value chain, and that they take effect on publication in the official gazette; the Commission will finalise them at least 30 days after that publication, and invites objections within 30 days of it (p2–3).
The draft text then reads as a conventional regulation. Chapter 1 gives short title and commencement; Chapter 2 states the objective — keeping adequate reserves within the state's control area, holding frequency near 50 Hz and relieving intra-state congestion; Chapter 3 defines 28 terms (PRAS, SRAS-Up/Down, TRAS, AGC, ACE, Nodal Agency, SDSMA, energy storage, demand response, URS); Chapter 4 brings intra-state entities, including storage and demand-response resources, into scope (p3–7).
Chapter 5 is the operative core. It lists the types of ancillary services and requires the Nodal Agency (SLDC) to estimate and publish the SRAS requirement, then handles SRAS in Part I: who may be an SRAS provider and on what technical conditions (p8); when SRAS is activated and in which control modes, with the ACE formula (p8–9); procurement, standing consent, declarations of technical parameters and of energy/compensation charges, and day-ahead identification of un-requisitioned capacity in Section 62 stations (p9–11); merit-order allocation, despatch by automated secondary signal, and metering of delivered energy per time block (p11–12); payment and payback through the SDSMA, with no incentive at the introductory stage (p12); monitoring of provider response and disqualification for persistent under-performance (p13). Part II deems Section 62 stations, including those holding URS, available in shortfall or emergency conditions (p13–14). Part III provides weekly accounting and settlement via the SDSMA and B&SC and exempts SRAS from transmission charges and losses (p14–15). Part IV requires the Nodal Agency to submit a Detailed Procedure for Commission approval within three months and preserves the Commission's powers to relax provisions and remove difficulties (p15–16).
Read with this
The regulation
- Dated 15 Jul 2025Ancillary Services Regulations, 2025
Other copies of these documents (1)
- Dated 15 Jul 2025Ancillary Services Regulations, 2025
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.