KERC · Karnataka Electricity Regulatory Commission

Ancillary Services Regulations, 2024 — Draft

Karnataka Electricity Regulatory Commission (Ancillary Services) Regulations, 2024

Draft regulationDated 1 Jan 2025No. KERC/S/F-31/Vol-1402/1251 dated 01.01.2025

Draft

A proposal that has since been finalised as the Ancillary Services Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Karnataka Electricity Regulatory Commission's draft Ancillary Services Regulations, 2024, issued as a notification dated 01.01.2025 (No. KERC/S/F-31/Vol-1402/1251) so that stakeholders can comment before it is finalised — it is a draft, not a settled regulation (p1–3). The notification explains why ancillary services are needed in a renewables-heavy grid, states that the regulations will apply to all stakeholders in the electricity value chain, and that they take effect on publication in the official gazette; the Commission will finalise them at least 30 days after that publication, and invites objections within 30 days of it (p2–3).

The draft text then reads as a conventional regulation. Chapter 1 gives short title and commencement; Chapter 2 states the objective — keeping adequate reserves within the state's control area, holding frequency near 50 Hz and relieving intra-state congestion; Chapter 3 defines 28 terms (PRAS, SRAS-Up/Down, TRAS, AGC, ACE, Nodal Agency, SDSMA, energy storage, demand response, URS); Chapter 4 brings intra-state entities, including storage and demand-response resources, into scope (p3–7).

Chapter 5 is the operative core. It lists the types of ancillary services and requires the Nodal Agency (SLDC) to estimate and publish the SRAS requirement, then handles SRAS in Part I: who may be an SRAS provider and on what technical conditions (p8); when SRAS is activated and in which control modes, with the ACE formula (p8–9); procurement, standing consent, declarations of technical parameters and of energy/compensation charges, and day-ahead identification of un-requisitioned capacity in Section 62 stations (p9–11); merit-order allocation, despatch by automated secondary signal, and metering of delivered energy per time block (p11–12); payment and payback through the SDSMA, with no incentive at the introductory stage (p12); monitoring of provider response and disqualification for persistent under-performance (p13). Part II deems Section 62 stations, including those holding URS, available in shortfall or emergency conditions (p13–14). Part III provides weekly accounting and settlement via the SDSMA and B&SC and exempts SRAS from transmission charges and losses (p14–15). Part IV requires the Nodal Agency to submit a Detailed Procedure for Commission approval within three months and preserves the Commission's powers to relax provisions and remove difficulties (p15–16).

Standard name
Ancillary Services Regulations
Primary topics
Ancillary services and reserves, Scheduling and despatch, Energy accounting and settlement

Read with this

The regulation

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document