CSERC · Chhattisgarh State Electricity Regulatory Commission
Determination of Tariff for Procurement of Power from Rooftop PV Solar Projects (First Amendment) Regulations, 2016
Chhattisgarh State Electricity Regulatory Commission (Determination of tariff for procurement of power from Rooftop PV Solar Power Projects by distribution licensees of State) (First Amendment) Regulations, 2016
AmendmentDated 16 Jun 2017No. 77/CSERC/2016
Amends the Rooftop PV Solar Power Projects Tariff Regulations, 2013.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-notification amendment by the Chhattisgarh State Electricity Regulatory Commission to its 2013 principal regulations on determining the tariff for procurement of power from rooftop PV solar projects by the State's distribution licensees (p2). The notification number is quoted as No. 77/CSERC/2016; the text opens by reciting that the Principal Regulations were made under sections 61 and 86 read with section 181 of the Electricity Act 2003 to specify the terms and conditions of such tariff (p2).
Section 1 gives the short title and states that the amendment comes into force from the date of publication in the CG Rajpatra.
Sections 2 to 5 substitute four provisions of the Principal Regulations rather than altering the tariff itself. Section 2 replaces the definition of a rooftop PV and ground-mounted solar project, setting the eligible capacity band and including the evacuation system up to the interconnection point (p3). Section 3 replaces the definition of the solar meter used to account for generation (p3). Section 4 replaces the grid-connectivity clause, restricting eligibility for the generic tariff to projects connected to the distribution network at 33 kV and below, and adds a capacity-to-evacuation-voltage table plus a proviso on who bears infrastructure augmentation charges when installed capacity exceeds the contracted load (p3). Section 5 replaces the communication-requirement clause, specifying what the project's communication system must log, display and support, and how it must interface locally and remotely (p4).
Read with this
The regulation
- Dated 7 Oct 2013Rooftop PV Solar Power Projects Tariff Regulations, 2013
Amendments and corrections
- Dated 4 Oct 2019Changes some provisions: Grid Interactive Distributed Renewable Energy Sources Regulations, 2019
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.