Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the CSERC's principal framework for grid-connected distributed renewable energy in Chhattisgarh, notified as No. 82/CSERC/2019 and dated 4 October 2019 (p2). The preamble sets out the policy background — the national 40 GW rooftop solar target for 2022, MNRE's 1 kWp minimum-connectivity guideline, the Forum of Regulators' April 2019 draft model regulations, and RPO eligibility for power procured from such projects (p2). It is made under ss. 42, 61, 66, 86 read with s. 181 of the Electricity Act 2003, applies State-wide, and comes into force on Gazette publication, which is not dated in the text (p2).
Regulations 2–6 (pp3–6) define the working vocabulary — DRE, prosumer, PDRES, IDRES, hosting capacity, net metering, settlement period, third-party ownership, SNA — fix scope and applicability, and require the distribution licensee to build a web-based application system, publish quarterly DRE capacity data and report annual additions to the Commission.
The regulation then splits into parts. Part A (p6) governs Renewable Purchase Obligation and REC participation. Part B (pp6–8) sets technical standards, safety and anti-islanding requirements, interconnection references to CEA instruments and Supply Code, and the metering infrastructure and testing regime. Part C (pp8–14) is the net metering code: eligibility, capacity limits against sanctioned load with a minimum system size, the online application and approval process with its timelines, work-completion and commissioning (with a different route above and below 500 kW), billing-period energy accounting including time-of-day set-off, meter-defect accounting, and settlement of year-end surplus. Part D (pp14–16) covers Independent DRE Systems: eligibility, minimum project size, feed-in tariff under s. 62 and competitive procurement under s. 63, interconnection point, and banking of energy. Part E (pp16–18) establishes the institutional machinery — a DRE Advisory Committee and an in-house DRE Cell in each licensee, with their composition and functions. Part F (p19) covers penalties for missed timelines, and the Commission's powers to direct, relax, amend and remove difficulties.
Regulation 30 preserves existing rooftop projects under the 2013 rooftop PV tariff regulations, which remain under that regime unless they opt into these Regulations (p19).
Read with this
Amendments and corrections
Procedures and orders made under it
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 corrigendum.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.