MERC · Maharashtra Electricity Regulatory Commission
Framework for Resource Adequacy Regulations, 2024 — Statement of Reasons
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (FRAMEWORK FOR RESOURCE ADEQUACY) REGULATIONS, 2024
Statement of reasonsDated 20 Jun 2024
The commission's reasons for the Framework for Resource Adequacy Regulations, 2024.
Summary
Summary written by software, from pages 1 to 29 of 33. Check the regulator's original before you rely on it.
What it is. The Statement of Reasons for the Maharashtra Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024, dated 20 June 2024 (p1). It records why the Commission finalised the RA Regulations and is written clause by clause: for each provision it quotes the draft text, summarises stakeholder comments, gives the Commission's analysis and ruling, then quotes the text as adopted. The Regulations are made under Section 181 of the Electricity Act, 2003 read with Sections 61, 66 and 86, after previous publication (p2).
Background and consultation. Maharashtra's peak demand and energy requirement are projected to grow, while RE has risen from 21% of installed capacity in FY19 to 31% in FY24, so RA measures are needed to meet forecast demand at all times while optimising and sharing resources among distribution licensees and maximising clean energy penetration (p1). The trigger is the Ministry of Power's December 2022 Electricity Amendment Rules requiring SERCs to frame RA Regulations in line with CEA guidelines and FOR model regulations (p1). The draft Regulations were published on 7 March 2024 and the last date for objections, 28 March 2024, was extended to 15 April 2024; ten entities responded and the list is at Annexure-I (p1–2).
Commencement and scope. Regulation 1.3 brings the Regulations into force from Gazette notification or as separately notified; the Commission accepted stakeholders' concerns about initial timelines and added provisos so that Regulation 21 timelines apply from FY 2025-26 and for FY 2024-25 are notified separately (p2–3). The objective clause is retained, with transmission resource planning required to be consistent with the MERC State Grid Code Regulations, 2020 (p4). Applicability is broadened to full transmission open access participants, and distribution licensees must factor partial open access consumers' demand into their forecasts (p5).
Horizon, granularity and procurement. The Commission added a long-term horizon beyond five years, defining LT-DRAP, MT-DRAP and ST-DRAP; only MT and ST go to the Commission for approval while LT is for planning and national consistency (p6–7, p28). Demand assessment must be at least hourly or sub-hourly (p7). Permitted procurement sources and routes are widened, in-state optimisation is retained with STU/SLDC declaring the available transmission corridor on a web portal, and distribution licensees must demonstrate 100% tie-up for the first year and at least 90% for the second year (p23–25). Power procurement plan contents and STU consultation were added to keep the plan consistent with the transmission system plan (p25–26).
Sharing, monitoring and penalty. Surplus capacity must be declared on a shared portal and only distribution licensees seek plan approval, with the Commission taking STU/SLDC inputs; STU/SLDC communicate the state-aggregated shortfall by 15 September and the Commission approves plans by 30 September (p26–29). Non-compliance attracts a charge set at 1.1 times the marginal or 1.25 times the average capacity charge, whichever is higher, as approved in the licensee's ARR/tariff order; requests for trial periods and no-penalty phases were not accepted, with utilities free to approach the Commission case by case (p29).
Read with this
The regulation
- Date not statedFramework for Resource Adequacy Regulations, 2024
Procedures and orders made under it
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.