MERC · Maharashtra Electricity Regulatory Commission
Framework for Resource Adequacy Regulations, 2024
Maharashtra Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024
RegulationDate not statedNo. MERC/Tech/Regulation/______
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are MERC's Framework for Resource Adequacy Regulations, 2024 (p32), made under s.181 read with ss.61, 66 and 86 of the Electricity Act 2003. They extend to the whole of Maharashtra and bind generating companies, distribution licensees, MSLDC, STU, full transmission open-access participants and other grid-connected entities (p33). They take effect from Gazette notification, but the Regulation 21 compliance calendar applies only from FY 2025-26, with FY 2024-25 timelines to be notified separately (p32).
Chapter 1 (p32–35) gives the objective — planning generation and transmission to meet projected demand against specified reliability standards at least cost — and the vocabulary of resource adequacy: capacity credit, EENS, NENS, LOLP, PRM, RAR, net load, and the LT/MT/ST horizons and their DRAP/NRAP plan types. Chapter 2 (p35–36) sets the four-step framework (demand assessment and forecasting, generation resource planning, procurement planning, monitoring and compliance) and requires each distribution licensee to prepare LT-, MT- and ST-DRAPs and to feed data upward to CEA and Grid India/NLDC.
Chapter 3 (p36–40) governs demand assessment: long/medium-term forecasting obligations on the distribution licensee, permitted methodologies, mandatory adjustment for policy and demand-side drivers, loss and peak-factor treatment, at least three scenarios, and the annual submission chain from distribution licensee to MSLDC to Authority/NLDC/RLDC. Chapter 4 (p40–45) is the technical core: mapping of contracted and retiring resources with machine characteristics, capacity crediting by a net-load top-250-hour approach for wind/solar and other approaches for hydro, thermal and storage, assessment of planning reserve margin against reliability indices, and derivation of the resource gap and RAR, including how the national and state peaks are allocated down to licensees and the minimum long/medium/short-term contract mix.
Chapter 5 (p45–50) covers procurement planning — least-cost optimal resource mix, procurement sources and tenure, intra-state first optimisation, capacity sharing and trading, prior Commission approval of PPAs/PSAs, and the exemptions under which a licensee may buy power without prior approval. Chapter 6 (p50) provides monitoring and a non-compliance charge levied by MSLDC for RAR shortfall, which cannot be recovered through ARR. Chapter 7 (p50–52) allocates data and reporting duties, sets the annual timeline calendar, requires website publication of procurement and merit-order data, and mandates dedicated planning and real-time procurement cells. Chapter 8 (p53) is boilerplate — directions, deviation, relaxation, practice directions, amendment, removal of difficulties. Annexure-I (p54–57) supplies the data-requirement templates.
Read with this
Commencement notices and reasons
Procedures and orders made under it
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.