MERC · Maharashtra Electricity Regulatory Commission
Resource Adequacy Plan Timelines, Framework for Resource Adequacy Regulations, 2024 — FY 2024-25 Notification
Timelines to be followed under the applicable provisions of the MERC (Framework for Resource Adequacy) Regulations, 2024 for FY 2024-25
OrderDated 3 Jul 2024Published in the Gazette 20 Jun 2024
Made under the Framework for Resource Adequacy Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
MERC's two-page notification of 3 July 2024 (p1) fixes, for FY 2024-25 only, the deadlines for Maharashtra's resource-adequacy planning cycle. It exists because the MERC (Framework for Resource Adequacy) Regulations, 2024 — notified in the Official Gazette on 20 June 2024 and in force from that date — defer their Regulation 21 timelines to FY 2025-26 and expressly leave FY 2024-25 to be notified separately (p1–2). The Commission gives its reason: utilities need preparation time, and CEA has not yet notified or approved a national-level RA plan setting the reliability indices (PRM, LOLP, NENS) on which state planning depends (p1).
Paragraph 5 and its table (p2) are the operative part. They set a dated sequence for FY 2024-25 — DLs' category-wise consumption data to STU/MSLDC, MSLDC's state-level forecasts to CEA/RLDC/NLDC, DLs' ST-DRAP and MT-DRAP to the Commission, state-shortfall reporting, Commission approval, DL contracting for shortfall/surplus, and STU/MSLDC's aggregate state Annual Rolling Plan to NLDC — with the last two items left to CEA/NLDC timelines rather than a Commission date. A second column gives the recurring calendar for Annual Rolling Plans from FY 2026-27 onwards. The notification is signed by the Chairperson and both Members (p2).
Read with this
The regulation
- Date not statedFramework for Resource Adequacy Regulations, 2024
Commencement notices and reasons
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.