Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Renewable Energy Purchase Obligation Regulations, 2010 — 2011 Amendment — Draft

Tamil Nadu Electricity Regulatory Commission (Renewable Energy Purchase Obligation) (Amendment) Regulations, 2011

Draft amendmentDated 19 May 2011TNERC / RPO / 19 / …… dated 19-05-2011

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC consultation package dated 19 May 2011: a two-page notice inviting stakeholder comments (pp1–2), followed by draft amending regulations to the TNERC (Renewable Energy Purchase Obligation) Regulations, 2010 (pp3–7). Comments are due by 20 June 2011 (pp1, 3).

The notice records that the 2010 RPO Regulations were notified on 7 December 2010 and gazetted on 22 December 2010, and that a CERC amendment of 29 September 2010 allowing renewable energy certificates for captive renewable consumption requires consequential changes to Tamil Nadu's RPO framework (p1). It also puts broader questions to stakeholders: delicensed generation, the section 86(1)(e) mandate, whether captive RECs can count toward a licensee's RPO, the seasonal nature of Tamil Nadu's renewable sources, planning of conventional capacity by TANGEDCO, possible stranded capacity and how stranded costs should be handled, and competitive sale of any surplus power (pp1–2).

The draft makes three changes. Regulation 2 replaces the definition of 'Obligated Entity' so that it covers distribution licensees, owners of captive generating plants and open access consumers in Tamil Nadu (p4). Regulation 3 substitutes the whole RPO regulation: a year-wise table of minimum total and solar RPO percentages for 2011-12 to 2013-14 (p4); provisos on NVVN bundled power, solar shortfall, inclusion of existing renewable purchases and continuation of existing PPAs (p5); conditions applying the RPO to grid-connected captive consumption and to conventional open access consumption (pp5–6); and a carry-forward rule where no RPO is specified for a year (p6). Regulation 4 adds provisos to regulation 6(1) on REC eligibility: a three-year bar after premature termination of a preferential-tariff PPA; access for renewable CGPs that forgo concessional transmission or wheeling, banking and electricity-duty benefits, with a three-year wait after forgoing; disapplication where those benefits are withdrawn; and referral of disputes to the Commission (pp6–7).

The amendments are stated to take effect on Gazette publication, but no Gazette date is printed because this is a draft (pp3–4).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document