TNERC · Tamil Nadu Electricity Regulatory Commission
Renewable Energy Purchase Obligation Regulations, 2010 — 2011 Amendment — Draft
Tamil Nadu Electricity Regulatory Commission (Renewable Energy Purchase Obligation) (Amendment) Regulations, 2011
Draft amendmentDated 19 May 2011TNERC / RPO / 19 / …… dated 19-05-2011
Draft
A proposal that has since been finalised as the Renewable Energy Purchase Obligation Regulations, 2010 — Amendment (RPO for 2015-16 to 2017-18).
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a TNERC consultation package dated 19 May 2011: a two-page notice inviting stakeholder comments (pp1–2), followed by draft amending regulations to the TNERC (Renewable Energy Purchase Obligation) Regulations, 2010 (pp3–7). Comments are due by 20 June 2011 (pp1, 3).
The notice records that the 2010 RPO Regulations were notified on 7 December 2010 and gazetted on 22 December 2010, and that a CERC amendment of 29 September 2010 allowing renewable energy certificates for captive renewable consumption requires consequential changes to Tamil Nadu's RPO framework (p1). It also puts broader questions to stakeholders: delicensed generation, the section 86(1)(e) mandate, whether captive RECs can count toward a licensee's RPO, the seasonal nature of Tamil Nadu's renewable sources, planning of conventional capacity by TANGEDCO, possible stranded capacity and how stranded costs should be handled, and competitive sale of any surplus power (pp1–2).
The draft makes three changes. Regulation 2 replaces the definition of 'Obligated Entity' so that it covers distribution licensees, owners of captive generating plants and open access consumers in Tamil Nadu (p4). Regulation 3 substitutes the whole RPO regulation: a year-wise table of minimum total and solar RPO percentages for 2011-12 to 2013-14 (p4); provisos on NVVN bundled power, solar shortfall, inclusion of existing renewable purchases and continuation of existing PPAs (p5); conditions applying the RPO to grid-connected captive consumption and to conventional open access consumption (pp5–6); and a carry-forward rule where no RPO is specified for a year (p6). Regulation 4 adds provisos to regulation 6(1) on REC eligibility: a three-year bar after premature termination of a preferential-tariff PPA; access for renewable CGPs that forgo concessional transmission or wheeling, banking and electricity-duty benefits, with a three-year wait after forgoing; disapplication where those benefits are withdrawn; and referral of disputes to the Commission (pp6–7).
The amendments are stated to take effect on Gazette publication, but no Gazette date is printed because this is a draft (pp3–4).
Read with this
The regulation
- Dated 7 Dec 2010Renewable Energy Purchase Obligation Regulations, 2010
Amendments and corrections
Earlier drafts
- Dated 24 Aug 2012Renewable Energy Purchase Obligation (Amendment) Regulations, 2012 — Draft
- Dated 16 Oct 2012Renewable Energy Purchase Obligation (Amendment) Regulations, 2012 — Draft
- Dated 7 Feb 2014Tamil Nadu Renewable Energy Purchase Obligation Regulations, 2010 — Draft Amendment, 2014
- Dated 24 Apr 2015Renewable Energy Purchase Obligation Regulations, 2010 — Amendment, 2015 — Draft
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.