TNERC · Tamil Nadu Electricity Regulatory Commission
Renewable Energy Purchase Obligation Regulations, 2010
Tamil Nadu Electricity Regulatory Commission (Renewable Energy Purchase Obligation) Regulations, 2010
RegulationDated 7 Dec 2010TNERC/RPO/ 19/1 dated 07-12-2010
Replaced by Renewable Energy Purchase Obligation Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or purported to have been done under the repealed Regulations so far as it is not in consistent with these Regulations shall be deemed to have been or purported to have been done under these Regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is TNERC's principal Renewable Energy Purchase Obligation (RPO) regulation, issued as Notification No. TNERC/RPO/19/1 dated 07-12-2010 (p1). It creates the state-level obligation on "obligated entities" — those mandated under s.86(1)(e) of the Electricity Act — to buy a minimum share of their energy from renewable sources, and it plugs that obligation into the CERC renewable energy certificate (REC) market.
Regulation 3 (p3–4) is the operative core. It does not itself fix the RPO percentage: the quantum is whatever the Commission's separate tariff regulations/orders on renewable energy specify from time to time, with a solar carve-out that a portion must come from solar generation. Five provisos deal with counting the solar portion of NVVN bundled power, falling back to non-solar renewables when solar energy or solar RECs are unavailable in a year and the Commission is satisfied, including existing purchases in the obligation, and letting existing renewable energy PPAs run to their present validity even if they overshoot the percentage. If no RPO is fixed for a year, the previous year's continues until revised (p4).
Regulation 4 (p4–5) makes CERC-issued RECs the valid instrument for discharging the obligation, requires solar certificates where a separate solar quota exists, and requires obligated entities to deposit certificates with the State Agency. Regulation 5 (p5) designates the State Load Dispatch Centre (or a substitute designated by the Commission) as State Agency — accreditation, recommending projects for registration, quarterly compliance reporting to the Commission, and remuneration fixed by the Commission. Regulation 6 (p6) sets the conditions under which a renewable generator may seek accreditation, mainly the absence of a preferential-tariff PPA and the price at which it sells. Regulation 7 (p6–7) provides the default consequences: deposit into a State Agency fund of an amount tied to the shortfall in units and the CERC forbearance price, use of the fund to buy certificates, a 15-day deposit deadline breach of licence for distribution licensees, penalty under s.142, and a carry-forward route where non-availability of certificates causes bona fide difficulty. Regulation 8 (p7) lets the Commission review, add, amend or alter the regulations to remove difficulties. Definitions run across Regulations 2(1)(a)–(n) (p1–3). The regulation contains no schedules or formats, and the Gazette publication date is not printed.
Read with this
Amendments and corrections
Earlier drafts
- Dated 19 May 2011Renewable Energy Purchase Obligation Regulations, 2010 — 2011 Amendment — Draft
- Dated 24 Aug 2012Renewable Energy Purchase Obligation (Amendment) Regulations, 2012 — Draft
- Dated 16 Oct 2012Renewable Energy Purchase Obligation (Amendment) Regulations, 2012 — Draft
- Dated 7 Feb 2014Tamil Nadu Renewable Energy Purchase Obligation Regulations, 2010 — Draft Amendment, 2014
- Dated 24 Apr 2015Renewable Energy Purchase Obligation Regulations, 2010 — Amendment, 2015 — Draft
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.