MPERC · Madhya Pradesh Electricity Regulatory Commission

Banking of Power SOP, 2026

Standard Operating Procedure for Banking of Power

ProcedureDated 17 Aug 2026

Made under the Methodology for Open Access Charges and Banking Charges for Green Energy Open Access Consumers Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

MPERC's order of 17 August 2026 (p1) finalises and issues the Standard Operating Procedure for Banking of Power as Annexure-1. It complies with the Commission's earlier order of 18.08.2025 in Petition No. 29 & IA Nos. 21 & 23 of 2025 (M/s Continuum MP Windfarm Pvt. Ltd.), which had directed MPPMCL to prepare a banking SOP in consultation with the three Discoms, SLDC and Executive Director (CRA), MPPTCL; MPPMCL's draft came by letter of 22.07.2026 (p1). The order directs publication on the Discom/MPPTCL/SLDC/MPPMCL portals and service on named officers (p1).

The SOP (pp2–13) is a procedural instrument for Green Energy Open Access Consumers wanting to bank surplus renewable energy. Chapter I sets the title, commencement (date of Commission approval, in force until superseded) and applicability to GEOA consumers connected to the intra-State transmission and/or distribution system (p2). Chapter II defines the operative concepts — actual energy-related cost, associated RE generator, banking, banking charges, the three-month banking cycle and banking month, benchmark rate at banking, and licensees — with formulas for aggregating cost and for an energy-weighted benchmark rate (pp2–5).

Chapter III is the operating core: the application route and documents for LTOA/MTOA and STOA consumers (p5); terms and conditions of banking, including the monthly banking window, the three-month drawl cycle, lapse of undrawn energy, one extension per financial year, RECs on lapsed energy and exclusion from net metering (pp5–7); the fifteen-minute time-block methodology for computing surplus and banked energy, the monthly quantity cap and the proportionate reduction factor (pp7–9); statement, scheduling and drawl-back procedures (pp9–10); settlement priority between peak and off-peak energy and between overlapping cycles (p10); and the two-limb banking charge — an in-kind deduction applied in each time block and an additional monetary charge compensating the licensee's cost of returning banked energy, reconciled annually through a separate petition (pp10–11).

Chapter IV covers non-transferability of banked energy, change of RE generator, forecasting/deviation obligations and outage liability, then events of default, notice with a seven-day cure, termination, grievance redressal through a Discom nodal officer, and a removal-of-difficulties/review clause (pp11–13). Annexure A (pp14–15) gives the methodology for computing the additional monetary charge, valuing eligible energy at the benchmark rate and reconciling annually against actual costs.

Standard name
Energy Banking, Green Energy Open Access Regulations
Primary topics
Energy banking, Green energy open access, Open access

Read with this

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document