MPERC · Madhya Pradesh Electricity Regulatory Commission

Open Access Charges and Banking Charges for Green Energy Open Access Consumers Regulations, 2023 — Second Amendment, 2024

Madhya Pradesh Electricity Regulatory Commission (Methodology for determination of Open Access charges and Banking charges for Green Energy Open Access consumers) Regulations, 2023 (Second Amendments) (AG-46 (ii) of 2024)

AmendmentDated 24 May 2024No.1237/MPERC/2024 dated the 24th May 2024

Amends the Methodology for Open Access Charges and Banking Charges for Green Energy Open Access Consumers Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page amendment by the Madhya Pradesh State Electricity Regulatory Commission to its 2023 methodology for open access charges and banking charges for green energy open access consumers. It is issued at Bhopal on 24 May 2024 as No.1237/MPERC/2024 and cites itself as AG-46 (ii) of 2024, the Second Amendment to the Principal Regulations G-46 of 2023 (p1).

Regulation 1 supplies the short title and commencement: the amendment takes effect from publication in the Madhya Pradesh Gazette, no Gazette date being printed (p1).

Regulation 2 is the whole of the operative content and touches only Regulation 9 of the Principal Regulations (p2). It substitutes the second proviso so as to state when additional surcharge is not levied on a green energy open access consumer, and inserts two new provisos as the third and fourth, which state when such additional surcharge is levied and which class of green energy open access consumers it applies to. The existing third, fourth, fifth and sixth provisos are not reproduced; they simply continue and are renumbered as fifth through eighth.

The document restates neither Regulation 9 in full nor any schedule of charges, so it must be read together with the Principal Regulations. Nothing else in the 2023 framework is altered.

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access charges

Read with this

Procedures and orders made under it

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 corrigendum.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document