Methodology for Open Access Charges and Banking Charges for Green Energy Open Access Consumers Regulations, 2023

Madhya Pradesh Electricity Regulatory Commission (Methodology for determination of Open Access charges and Banking charges for Green Energy Open Access consumers) Regulations 2023 (G-46 of 2023)

RegulationDated 9 Mar 2023No. MPERC-2023-497 dated 9th March 2023

2 amendments to it are on Voltaic, the latest dated 24 May 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are MPERC's 2023 regulations setting out the methodology for determining open access charges and banking charges for green energy open access consumers in Madhya Pradesh (p1). They were issued on 9 March 2023 as No. MPERC-2023-497 (G-46 of 2023) under s.181 read with ss.42, 61 and 86 of the Electricity Act 2003, and come into force from the date of publication in the Madhya Pradesh Gazette — the Gazette date itself is not printed (p1).

Chapter 1 (p1–4) is framing: short title, commencement, application to the whole State, an objective clause, thirteen definitions, and a scope clause tying application to generation from renewable energy sources. The pivotal definition fixes the consumer class — a person with contracted demand or sanctioned load of 100 kW or more, excluding captive consumers (p3).

Chapter 2 (p4–10) is the operative core. Section 5 lists the charge heads, and Sections 6 to 10 specify the basis for each: transmission and wheeling charges, cross-subsidy surcharge, additional surcharge and standby charges are all left to the Commission's MYT transmission tariff and retail supply tariff orders, with provisos carving out dedicated lines, captive plants, waste-to-energy, green hydrogen/ammonia, offshore wind and consumers already paying fixed charges. Standby facility is tied to advance notice before gate closure. Section 11 creates the banking facility — banking cycles, scheduling of injection and drawal, monthly adjustment of banking charges, a floor on banked energy, peak/off-peak drawal rules, year-end reconciliation against actual power purchase cost, lapsing of unutilised energy and RECs for lapsed energy. Section 12 adds SLDC/RLDC scheduling fees and RE deviation charges.

Chapter 3 (p10–11) confers directions, relax, amend and remove-difficulty powers. There are no schedules or annexures: this is a framework instrument that defers nearly every rate to tariff orders.

Standard name
Green Energy Open Access Regulations, Energy Banking
Primary topics
Green energy open access, Open access charges, Energy banking

Read with this

Procedures and orders made under it

4 more documents belong here and are not on Voltaic: 3 copies in another language and 1 corrigendum.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.