Transmission Tariff Regulation, 2005 — Consolidated

Andhra Pradesh Electricity Regulatory Commission (Terms and conditions for determination of Transmission Tariff) Regulation, 2005

Consolidated copyDated 31 Dec 2025Regulation No. 5 of 2005

A consolidated copy of the Terms and Conditions for Determination of Transmission Tariff, 2005, published by APERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Andhra Pradesh Electricity Regulatory Commission's framework for setting the tariff for intra-State transmission of electricity, issued as Regulation No. 5 of 2005 and reproduced here as a consolidated text with the First Amendment (Regulation No. 1 of 2019) and the Second Amendment (Regulation No. 7 of 2023) incorporated, each insertion carrying a footnote (pp1, 4, 8, 11, 18, 20). It binds every transmission licensee operating in the State and governs the filings those licensees make to the Commission.

Part I (pp2–5) deals with short title, extent and commencement, definitions, and the extent of application: the Commission determines the Aggregate Revenue Requirement for transmission business under these principles, and that ARR is the basis for fixing transmission tariff and charges.

Part II (pp6–11) is the approach and procedure — how a licensee computes and files its ARR and its proposed tariff, what those filings must contain, publication of the application and public consultation, the Commission's timeline for disposing of a complete application, the Resource Plan and the multi-year tariff framework, including which ARR items are treated as controllable or uncontrollable and how gains and losses on each are passed through or shared.

Part III (pp12–18) sets out the computational principles: the main ARR items, the O&M cost formula built on circuit-km of lines and substation bays with an inflation index, Return on Capital Employed from the Weighted Average Cost of Capital applied to the Regulated Rate Base, the capital investment plan, depreciation and taxes on income, corrections for controllable and uncontrollable items, incentive and penalty for transmission losses, non-tariff income, the transmission tariff formula, and adoption of tariffs determined by competitive bidding.

Part IV (pp19–20) covers periodic and end-of-control-period reviews and the Commission's powers to amend, issue practice directions, remove difficulties and relax provisions. Parameters such as WACC components, loss ranges and targets are left to Commission orders for each control period rather than fixed on the face of the regulation.

Standard name
Transmission Tariff Regulations, Multi Year Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

The regulation

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document