Terms and Conditions for Determination of Transmission Tariff, 2005

Andhra Pradesh Electricity Regulatory Commission (Terms and conditions for determination of Transmission Tariff) Regulation, 2005

RegulationPublished in the Gazette 30 Nov 2005Regulation No. 5 of 2005

3 amendments to it are on Voltaic, the latest dated 11 Oct 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is APERC's principal regulation for setting the terms on which intra-State transmission tariff is determined in Andhra Pradesh, made under ss.61 and 62 read with s.181(2)(zd)–(zf) of the Electricity Act 2003 and notified in the Andhra Pradesh Gazette of 30 November 2005. It records that a draft was gazetted on 18-10-05 for public comment, that one commenter and APTRANSCO responded, and that the Commission finalised the text with modifications (p1). It applies to every person engaged in intra-State transmission in the State and takes effect on gazette publication (p1–2).

Part I (pp1–3) gives the short title, extent and commencement, and the definitions that carry the rest of the regulation — ARR, Base Year, Control Period, Regulated Rate Base, Other Business, Non-Tariff Income, Open Access Agreement/Regulation, SLDC and User. Part II (pp3–6) sets the framework and filing machinery: guidelines for computing ARR continue until replaced; costs are to be apportioned between SLDC and transmission until accounts are segregated; licensees file an ARR (and a first-Control-Period Resource Plan and Capital Investment Plan) ahead of the Control Period, together with a Filing for Proposed Tariff; the Commission disposes of filings, may modify or condition them, and issues an order within set timelines (p3–5). It lays out the multi-year framework — base year, controllable and uncontrollable items, and the pass-through and gain/loss-sharing treatment of each (pp5–6).

Part III (pp6–10) is the heart: what the ARR contains, and the principles for O&M expenses, return on capital employed through WACC and the Regulated Rate Base, the investment plan and its deviation limits, depreciation, taxes on income, incentive/penalty on transmission losses and other performance parameters, non-tariff income, the transmission tariff formula, and adoption of a tariff discovered by s.63 bidding (pp6–10). Part IV (p11) provides for periodic and end-of-Control-Period reviews, the Commission's power to amend, and saving clauses preserving its powers to act outside the regulation.

Standard name
Transmission Tariff Regulations, Multi Year Tariff Regulations
Primary topics
Transmission tariff, Multi Year Tariff (MYT), Tariff determination

Read with this

Commencement notices and reasons

Consolidated copies, for reference (1)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.