Transmission Tariff Regulation, 2005 — Second Amendment, 2023

The second amendment to the Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulation, 2005

Statement of reasonsDated 11 Oct 2023Regulation 7 of 2023 dated 11.10.2023

The commission's reasons for the Terms and Conditions for Determination of Transmission Tariff, 2005 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

APERC's Second Amendment to its 2005 Transmission Tariff Regulation, issued as Regulation 7 of 2023 (p1). The document has two layers. Page 1 is the Commission's order: it records that the draft amendment and a public notice were hosted on the website on 14.07.2023, that comments were invited by 14.08.2023, that none were received, and that the draft is therefore adopted as the final Regulation (p1).

The Annexure (pp2–5) is the operative text. Its introduction traces the lineage of the Principal Regulation — notified under ss.61 and 62 of the Electricity Act 2003 and gazetted on 30.11.2005, adopted by the newly constituted APERC through the 2014 Adaption Regulation, and first amended in 2019 (p2). Clause 1 names the regulation, applies it to any person in the intra-state transmission business in Andhra Pradesh, and brings it into force on Gazette publication (p3).

Clause 2 replaces sub-clauses 8.1–8.3 with a fuller set, 8.1–8.5, governing the transmission licensee's ARR and tariff filing: a compliance statement on past directives, newspaper public notice in English and Telugu, mandatory website disclosure in downloadable spreadsheet format (with an explanation defining that term), a 120-day window for the Commission to dispose of a complete application, and publication and billing under the approved tariff (pp3–4).

Clause 3 replaces sub-clauses 10.6–10.8 with a single clause on sharing gains and losses from controllable ARR items — reported through an annual performance petition, with items beyond the licensee's control passed through to consumers (pp4–5). Clause 4 adds clauses 26–28: power to issue orders and practice directions, power to remove difficulties, and power to relax provisions after hearing (p5).

Standard name
Transmission Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, ARR and true-up

Read with this

The regulation

Consolidated copies, for reference (1)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document