Skip to content

AERC · Assam Electricity Regulatory Commission

Terms and Conditions for Open Access Regulations, 2024

AERC (Terms and Conditions for Open Access) Regulations 2024

RegulationDated 21 Nov 2024Published in the Gazette 4 Dec 2024

1 amendment to it is on Voltaic, dated 16 Oct 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Assam Electricity Regulatory Commission made these regulations under Section 181 read with Sections 39, 40, 42, 61 and 86 of the Electricity Act, 2003. The notification is dated 21 November 2024, published in the Assam Gazette on 4 December 2024, and the regulations come into force on 1 April 2025 (p1). They extend to the whole of Assam and apply to open access on intra-state transmission and/or distribution systems, including when used with the inter-state transmission system. They cover existing as well as new open access customers and override earlier open access regulations and orders of the Commission (p1–2).

Chapter I defines terms and interpretive rules (p1–8). Chapter II sets eligibility: general open access is available to consumers with contract demand of 1 MW and above; green energy open access (GEOA) is available at 100 kW and above, with no load limit for captive green use (p9). It lists categories of customers, criteria for long-term (LTOA), medium-term (MTOA) and short-term (STOA) access, and the priority order for allotting capacity (p11–13). Chapter III designates SLDC as State Nodal Agency for STOA and AEGCL/STU for LTOA and MTOA, routes GEOA applications through the Central Nodal Agency portal, and prescribes application formats, fees, processing timelines, LTOA/MTOA/STOA grant procedures, consent requirements and open access agreements (p14–29). A detailed procedure is to be prepared by the nodal agencies and approved by the Commission (p17, p47).

Chapter IV lists the charges payable — transmission, wheeling, cross-subsidy surcharge, additional surcharge, standby, deviation, reactive energy, scheduling and system operation, banking and other charges — and sets out principles and green-energy concessions for several of them (p30–38). Chapter V covers scheduling, metering, energy losses and energy accounting, with SLDC responsible for accounting (p39–41). Chapter VI deals with billing, collection, late payment, default, payment security and the order in which energy from different sources is adjusted (p42–44). Chapter VII requires the State Nodal Agency to publish open access information and maintain communication systems (p45–46). Chapter VIII specifies the contents of the detailed procedure (p47). Chapter IX covers relinquishment and compensation for stranded capacity, computation of available capacity, curtailment priority, RPO compliance, dispute redressal, SLDC roles, inconsistency between instruments, repeal and savings, and the Commission's powers to relax, remove difficulties, amend and intervene (p48–54).

The regulations repeal the AERC (Terms and Conditions for Open Access) Regulations, 2018 and give these regulations overriding effect over banking and open access charge provisions in the 2015 cogeneration and renewable energy regulations (p53). Many operational details — formats, exact timelines, payment mechanisms and procedures — are left to the detailed procedure to be issued by the State Nodal Agency (p17, p47).

Standard name
Open Access Regulations

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document