Terms and Conditions for Open Access Regulations, 2024 — First Amendment, 2025 — Statement of Reasons

Assam Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2024, (First Amendment), 2025

Statement of reasonsDated 16 Oct 2025

The commission's reasons for the Terms and Conditions for Open Access Regulations, 2024 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Objects and Reasons that accompanies the first amendment to the AERC (Terms and Conditions for Open Access) Regulations, 2024. It records why the Commission amended the Principal Regulations and how it disposed of the two objections it received; it is not the notification text itself, which it orders to be published in the Official Gazette (p2, p7).

The Introduction traces the amendment to Petition No. 12/2025 concerning Regulation 4.3 and Regulation 4.5, and to the Commission's order of 24.09.2025 directing the change, and sets out the enabling powers under the Electricity Act, 2003 (p2). Section 2 documents the pre-publication process: the draft hosted on the Commission's website, a public notice of 25.09.2025 in two newspapers, objections invited up to 9 October 2025, comments from SLDC Assam and AMPIN Energy Transition, and a public hearing on 14.10.2025 attended by SLDC officers (p2–3).

The bulk of the document is Section 4's issue-by-issue analysis. On Clause 4.3 (green energy open access) SLDC questioned the drafting of the scheduling condition and AMPIN argued that solar output cannot be held constant across fixed blocks (p3–4). The Commission's decision treats the block requirement as applying to the schedule filed by the consumer/generator rather than to actual drawal, points deviations to DSM/imbalance charges, cites the MoP Green Energy Open Access Rules, 2022, finds the clause consistent with those Rules, and declines to change it; a definition of 'Lead GEOA Consumer' is added to the definitions (p4–5).

On Clause 4.5 (open access on dedicated and common feeders), the Commission confines metering/telemetry upgradation cost to the applicant's own metering and publishes a slightly revised final clause text (p6–7). On AMPIN's request for a timeline for the State Nodal Agency's Detailed Procedure and for a defined energy-banking settlement mechanism, the Commission states the procedure has been submitted by SLDC for approval and that banking will be finalized separately with the Commission's approval (p7). The document closes with the order to finalize and notify the amendment and the signatures dated 16.10.2025 (p7).

Standard name
Open Access Regulations, Green Energy Open Access Regulations
Primary topics
Open access, Green energy open access, Scheduling and despatch

Read with this

The regulation

Commencement notices and reasons

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.