Terms and Conditions for Open Access Regulations, 2024 — First Amendment, 2025 — Statement of Reasons
Assam Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2024, (First Amendment), 2025
Statement of reasonsDated 16 Oct 2025
The commission's reasons for the Terms and Conditions for Open Access Regulations, 2024 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Statement of Objects and Reasons that accompanies the first amendment to the AERC (Terms and Conditions for Open Access) Regulations, 2024. It records why the Commission amended the Principal Regulations and how it disposed of the two objections it received; it is not the notification text itself, which it orders to be published in the Official Gazette (p2, p7).
The Introduction traces the amendment to Petition No. 12/2025 concerning Regulation 4.3 and Regulation 4.5, and to the Commission's order of 24.09.2025 directing the change, and sets out the enabling powers under the Electricity Act, 2003 (p2). Section 2 documents the pre-publication process: the draft hosted on the Commission's website, a public notice of 25.09.2025 in two newspapers, objections invited up to 9 October 2025, comments from SLDC Assam and AMPIN Energy Transition, and a public hearing on 14.10.2025 attended by SLDC officers (p2–3).
The bulk of the document is Section 4's issue-by-issue analysis. On Clause 4.3 (green energy open access) SLDC questioned the drafting of the scheduling condition and AMPIN argued that solar output cannot be held constant across fixed blocks (p3–4). The Commission's decision treats the block requirement as applying to the schedule filed by the consumer/generator rather than to actual drawal, points deviations to DSM/imbalance charges, cites the MoP Green Energy Open Access Rules, 2022, finds the clause consistent with those Rules, and declines to change it; a definition of 'Lead GEOA Consumer' is added to the definitions (p4–5).
On Clause 4.5 (open access on dedicated and common feeders), the Commission confines metering/telemetry upgradation cost to the applicant's own metering and publishes a slightly revised final clause text (p6–7). On AMPIN's request for a timeline for the State Nodal Agency's Detailed Procedure and for a defined energy-banking settlement mechanism, the Commission states the procedure has been submitted by SLDC for approval and that banking will be finalized separately with the Commission's approval (p7). The document closes with the order to finalize and notify the amendment and the signatures dated 16.10.2025 (p7).
Read with this
The regulation
- Dated 21 Nov 2024Terms and Conditions for Open Access Regulations, 2024
Amendments and corrections
Commencement notices and reasons
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.