AERC · Assam Electricity Regulatory Commission
Terms & Conditions for Open Access Regulations, 2024 — Statement of Reasons
Statement of reasons for Assam Electricity Regulatory Commission (Terms & Conditions for Open Access) Regulations, 2024
Statement of reasonsDated 21 Nov 2024
The commission's reasons for the Terms and Conditions for Open Access Regulations, 2024 or one of its amendments.
Summary
Summary written by software, from pages 1 to 37 of 49. Check the regulator's original before you rely on it.
The document is the Statement of Objects and Reasons (SoR) for the Assam Electricity Regulatory Commission (Terms & Conditions for Open Access) Regulations, 2024, dated 21 November 2024 (p1–2). It is not the operative regulation; it explains why AERC is replacing its 2018 open access regulations and records how stakeholder comments changed the draft (p2, p4). It says the trigger is the Ministry of Power's Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022, including amendments of 27 January 2023 and 23 May 2023, whose Rule 5 asks state commissions to align open access regulations (p2). The stated goals are to accelerate renewable energy, reduce the open access transaction limit from 1 MW to 100 kW, and provide for cross-subsidy surcharge, additional surcharge and standby charge so ordinary consumers can buy green power (p2).
Pages 3–4 describe publication of the draft amendment regulations on AERC's website and a 13.07.2024 public notice in The Assam Tribune and Asomiya Pratidin; objections were due 5 August 2024 but extended to 16 August 2024 for SLDC and Emami (p3). Comments came from SLDC, APDCL, Ajanta Pharma, Ampin, Dalmia Cement, HUL, Emami, Manikaran Power and Star Cement; a public hearing was held on 29.10.2024 with the listed participants (p3–4).
Pages 4–37 are clause-by-clause. They record Commission decisions on the draft: the final regulation clarifies applicability and overriding effect (p4–5); definitions of allotted distribution/transmission capacity, banking, billing cycle, embedded/open access consumer, and a new Full Open Access Consumer (p5–8); eligibility, including the 100 kW green-energy open access threshold and no load limit for captive use (p8–9); treatment of net metering, dedicated/mixed/common feeders, and SEM/RTU metering (p9–13); open access categories and inter-state treatment (p13–14); application process and the Detailed Procedure deadline extended from 45 to 60 days (p14–17); LTOA, MTOA and STOA procedures (p18–24); agreements, charges generally, transmission charges, wheeling charges, cross-subsidy surcharge, additional surcharge, standby charges and deviation charges (p24–37).
Key outcomes: the effective date is revised to 1 April 2025 to align with the Detailed Procedure and tariff petitions (p17, p26, p31); charges not fixed in the regulations are left to tariff orders and MYT regulations (p26, p29); the regulations override specified provisions of the 2015 RE regulations, and the 2018 open access regulations are to be repealed with savings (p7, p29, p36).
Read with this
The regulation
- Dated 21 Nov 2024Terms and Conditions for Open Access Regulations, 2024
Amendments and corrections
Commencement notices and reasons
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.