OERC · Odisha Electricity Regulatory Commission
Amendment to Open Access Regulation by Orissa Legislative Assembly
AmendmentDated 13 Jun 2006No.OERC-JD(EA)/233/04 dated Dated the 13th June, 2006
Replaced by Terms and Conditions of Intra-State Open Access Regulations, 2020
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Terms and Conditions for Open Access Regulation, 2005.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short OERC notification, dated 13 June 2006, that brings into the public record a set of amendments to the Orissa Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2005 — the regulations originally gazetted on 21 June 2005 (p1). The amendments did not originate with the Commission: the 2005 Regulations were laid before the Orissa Legislative Assembly under section 182 of the Electricity Act, 2003, and the Assembly, meeting on 4 April 2006, approved modifications to them (p1–2). The Commission's role here is to notify those amendments and to publish them in the Orissa Gazette so that 310 copies can go to the State Department of Energy for laying before the Assembly in its next session (p2).
Only four provisions of the 2005 Regulations are touched (p1). Regulation 2(b) gains a requirement of government concurrence in relation to drawal allowed to a long-term customer. Regulation 10(4) gains a penalty consequence for licensees who fail to comply, and Regulation 10(5) gains a 90-day time limit. Regulation 12(1)(a)(iii) is refined by inserting units of measure into the two access charges — a per-MW basis for transmission and a per-500-KW basis for distribution access — so that the fees read as rates rather than flat amounts (p1).
Page 2 is not operative text: it is the file note (signed by the Jt. Director (Law), Jt. Director (EA) and Director (T) I/c) describing the correspondence from the Department of Energy and the Assembly Secretariat and recording the Commission's approval to gazette the amendments. A reader looking for substance should work from page 1 alone.
Read with this
The regulation
- Dated 6 Jun 2005Terms and Conditions for Open Access Regulation, 2005
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.