OERC · Odisha Electricity Regulatory Commission
Terms and Conditions for Open Access Regulation, 2005
Orissa Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulation, 2005
RegulationDated 6 Jun 2005No.OERC-JD(EA)-233/2004 dated 6th June, 2005
Replaced by Terms and Conditions of Intra-State Open Access Regulations, 2020
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Orissa Electricity Regulatory Commission issued this principal regulation on 6 June 2005 under s.42(2)–(4) read with ss.39, 40, 86 and 181 of the Electricity Act, 2003 (p1). It creates the framework for non-discriminatory open access to intra-state transmission and distribution systems in Orissa and is to come into force on publication in the Official Gazette, although the Gazette date is not printed (p1).
Regulations 1–3 give the title, extend the regulation to the whole State, define core terms such as allotted and reserved capacity, applicant, nodal agency and the Commission, and apply the regulation to intra-state transmission and distribution systems (p1–2). Regulation 4 makes licensees, generating companies including captive plants, and consumers eligible for open access, subject to available capacity, operational constraints and payment of transmission or wheeling charges plus a s.42 surcharge; it explains what operational constraints include (p2–3). Regulations 5–6 divide customers into long-term (25 years or more, with existing beneficiaries deemed long-term) and short-term (up to one year at a time, renewable), and preserve existing open access arrangements for their agreed term (p3).
Regulations 7–10 designate nodal agencies—STU or distribution licensee for long-term access and SLDC for short-term access—and set out criteria for allowing access, priority and allotment, first-come-first-served, congestion bidding for short-term applicants, and the methodology for determining available transmission and distribution capacity, including the STU's annual Statement of Opportunity and Commission resolution of capacity disputes (p3–6). Regulation 11 phases distribution open access by consumer size (above 5 MW, above 2 MW, above 1 MW) on separate commencement schedules depending on whether supply comes from a generating company or from another licensee, and defers sub-1 MW consumers to a later decision (p7).
Regulation 12 prescribes application procedures for long-term and short-term customers: system studies, non-refundable fees, access and commercial agreements, processing timelines, transfer restrictions, exit options and consequences of surrender or under-utilisation (p7–10). Regulations 13–16 cover charges (transmission, wheeling, cross-subsidy surcharge, additional surcharge, reactive energy, scheduling, system operation and energy losses), payment and security, first right of refusal for existing customers, and curtailment priority, with short-term customers curtailed first and pro-rata within a category (p10–12). Regulations 17–20 impose metering, ABT and grid-code obligations, and empower the Commission to issue practice directions, remove difficulties and amend the regulations (p12–13).
Read with this
Amendments and corrections
- Dated 13 Jun 2006Amendment to Open Access Regulation by Orissa Legislative Assembly
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.