GERC · Gujarat Electricity Regulatory Commission
Demand Side Management Regulations, 2012 — Draft
Gujarat Electricity Regulatory Commission (Demand Side Management) Regulations, 2012
Draft regulationDated 25 Dec 2011
Draft
A proposal that has since been finalised as the Gujarat Demand Side Management Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's draft framework regulation for Demand Side Management, binding on every distribution licensee in Gujarat within its own area of supply (p1). It is enabling rather than prescriptive: the Commission sets the objectives, targets, guidelines and approval gates, while licensees carry out load research, plan, execute and report. It takes effect from Gazette notification (p1).
Chapter 1 gives the short title, applicability and commencement, and defines the vocabulary the rest of the instrument uses — baseline data, cost effectiveness index, DSM itself (actions beyond the meter/point of supply to alter end-use of electricity), DSM Resource Acquisition, Energy Services Company, and the two verification activities, Evaluation Measurement and Verification and Monitoring and Reporting (p1–2). Chapter 2 has the Commission formulate DSM objectives and set a target for each licensee, with licensees assessing technical DSM potential in their area — the first such assessment within six months of notification, later ones a year before each MYT control period — and the Commission issuing process guidelines, though guidelines are expressly not a precondition for the first plan (p2–3).
Chapter 3 requires each licensee to constitute a DSM Cell within a month of notification, of a specified size and rank mix, with defined responsibilities from load research through implementation (p3–4). Chapter 4 is the procedural core: load and market research and baseline data (baseline not a precondition for initial programmes); a perspective DSM Plan for the control period, submitted within one year of notification, with rolling annual plans filed alongside Annual Tariff Petitions; review and approval by the Commission; a separate Programme Document and prior Commission approval for every programme; implementation, including quick-gain programmes; a cost-recovery route through tariff or another mechanism for net incremental costs, with non-cost-effective but socially beneficial programmes funded by the Commission; and monitoring/reporting and third-party EMV (p4–8). Chapters 5–7 add six-monthly progress reports, a programme completion report within a month of completion, discretionary incentives for achieving or exceeding objectives, and the Commission's powers to amend, remove difficulties, issue directives and decide disputes (p8).
Read with this
The regulation
- Dated 7 May 2012Gujarat Demand Side Management Regulations, 2012
Commencement notices and reasons
- Dated 6 Aug 2012DSM Objectives for the State of Gujarat, 2012
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.