GERC · Gujarat Electricity Regulatory Commission
Gujarat Demand Side Management Regulations, 2012
Gujarat Electricity Regulatory Commission (Demand Side Management) Regulations, 2012
RegulationDated 7 May 2012Notification No. 1 of 2012
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's principal framework regulation for demand side management, issued as Notification No. 1 of 2012 under s.181(2)(zp) of the Electricity Act, 2003 (p1). It binds only distribution licensees in Gujarat, in their respective areas of supply, and takes effect from the date of its notification in the Official Gazette — that Gazette date is not printed in the text (p1).
Chapter 1 gives the short title, extent and commencement, and defines the vocabulary the rest of the instrument runs on, including DSM, baseline data, DSM resource acquisition, cost effectiveness index, EMV, monitoring and reporting, and point of supply (p1–3). Chapter 2 sets out the architecture rather than the numbers: the Commission formulates DSM objectives and DSM targets for each licensee, licensees must assess technical DSM potential in their area ahead of each MYT control period, and the Commission issues guidelines on load and market research, programme implementation, cost effectiveness, monitoring and reporting, eligibility, target-setting and funding (p3–4).
Chapter 3 requires every distribution licensee to constitute a DSM Cell within a month of notification, prescribes its staffing hierarchy (variable only with Commission approval), and lists its functions from load research and baseline development through plan formulation, project design, approvals, implementation and any further function the Commission assigns (p4–5).
Chapter 4 is the operating core: load and market research and baseline data; formulation and submission of a perspective DSM Plan for the control period and a rolling annual plan filed with annual tariff petitions; review and approval of the plan; preparation and prior approval of individual programme documents; implementation; a cost-recovery route through tariff or other mechanism tied to prior approval, faithful implementation and cost effectiveness; monitoring and reporting; and third-party evaluation, measurement and verification of savings (p5–8).
Chapters 5 to 7 close it out: six-monthly progress and expenditure reports, a programme completion report after each programme, Commission discretion to grant incentives, and miscellaneous powers of amendment, difficulty removal, orders and directives, dispute adjudication and a savings clause preserving the Commission's inherent powers (p8–9). Much of the substantive content — targets, cost-effectiveness methodology, eligibility criteria — is deferred to guidelines the Commission is to issue later, and the regulation expressly says those guidelines are not a prerequisite for the first DSM plan (p4).
Read with this
Commencement notices and reasons
- Dated 6 Aug 2012DSM Objectives for the State of Gujarat, 2012
Earlier drafts
- Dated 25 Dec 2011Demand Side Management Regulations, 2012 — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.