GERC · Gujarat Electricity Regulatory Commission
DSM Objectives for the State of Gujarat, 2012
Objectives for Demand Side Management for the State of Gujarat
Statement of reasonsDated 6 Aug 2012
The commission's reasons for the Gujarat Demand Side Management Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
On 6 August 2012 the Gujarat Electricity Regulatory Commission issued a one-page statement of objectives for Demand Side Management (DSM) in Gujarat under the GERC (Demand Side Management) Regulations, 2012 (p1). It does not set tariffs, targets or procedures; it declares what DSM should achieve.
The seven objectives are to control, reduce and influence demand through policies; encourage consumers to change both the timing and level of electricity use; complement supply-side strategies so licensees can avoid or postpone generation, transmission and distribution capacity additions; lower the overall cost of electricity; cut greenhouse-gas emissions; supplement national DSM schemes set out by the Bureau; and induce lasting structural or behavioural change that increases adoption of energy-efficient technologies, services and practices (p1).
It is signed by the Secretary and carries no document number, commencement clause or monitoring mechanism (p1).
Read with this
The regulation
- Dated 7 May 2012Gujarat Demand Side Management Regulations, 2012
Earlier drafts
- Dated 25 Dec 2011Demand Side Management Regulations, 2012 — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.