Bihar Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025

Draft regulationDated 29 Jul 2025

Draft

A proposal that has since been finalised as the Framework for Resource Adequacy Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

What it is. A consultation package from the Bihar Electricity Regulatory Commission: the complete draft of the BERC (Framework for Resource Adequacy) Regulations, 2025 (pp1–14), followed by a consultative paper that sets out the legal trigger, the reasoning and the comment process (pp15–16). The draft is made under s.181 of the Electricity Act, 2003 read with ss.61, 66 and 86, extends to the whole of Bihar, and is to come into force on notification in the Official Gazette (p1).

Who it binds. Generating companies, distribution licensees, the SLDC, the STU and other grid-connected entities in the State (p1). Most operative duties sit on the distribution licensee.

Chapters 1–2 (pp1–3) state the objective — planning generation resources so load is served reliably at least cost under a specified reliability standard — and reduce the framework to four steps: demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance. Chapter 1's definitions supply the working vocabulary (capacity credit, EENS, NENS, LOLP, PRM, LT-DRAP, ST-DRAP, long term of ten years, short term of one year).

Chapter 3 (pp3–6) makes the distribution licensee responsible for forecasting demand and energy in its own area, per consumer category, from a menu of statistical methods with a rule for choosing among them, adjusted for DSM, open access, DERs, EVs, pump solarisation, tariff signals and policy drivers. It requires probabilistic scenario analysis with at least three scenarios, converts MWh forecasts into MW peak demand, and requires short-term hourly/sub-hourly forecasting. Regulation 8 gives STU and SLDC the job of aggregating state-level long- and short-term demand and passing it to the Authority, NLDC and RLDC.

Chapter 4 (pp6–9) covers generation resource planning: mapping existing, upcoming and retiring resources with their technical parameters; capacity crediting of conventional and RE resources; a multi-year averaging rule for capacity credit; a planning reserve margin tied to reliability indices; and identification of the licensee's resource gap, feeding LT-DRAP and ST-DRAP, which must be guided by the national plans.

Chapter 5 (pp9–12) governs procurement: least-cost resource-mix modelling, an ordering preference from in-state to intra-region to inter-region procurement, a table of lead times by technology, annual rolling plans and Commission approval.

Chapters 6–8 (pp12–14) set monitoring and reporting, a case-by-case non-compliance charge for shortfall against the approved RA requirement, a data-sharing protocol, a calendar of annual deadlines, and the Commission's powers to direct, relax and remove difficulties, plus repeal of the 2018 power purchase regulations with savings.

The consultative paper (pp15–16) quotes Rule 16 of the Electricity (Amendment) Rules, 2022, records the Ministry of Power guidelines of 28.06.2023 and the Forum of Regulators model regulations, notes that the 2018 regulations presently govern procurement, and invites comments by 02.09.2025 with a hearing on 09.09.2025.

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Energy storage deployment

Read with this

The regulation

Other copies of these documents (1)

Proposed changes (drafts with no final yet)

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗