Skip to content

BERC · Bihar Electricity Regulatory Commission

Framework for Resource Adequacy Regulations, 2025

Bihar Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025

RegulationDated 26 Nov 2025BERC Case No. 28/2025-07 dated 26.11.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Bihar Electricity Regulatory Commission's (Framework for Resource Adequacy) Regulations, 2025, notified as BERC Case No. 28/2025-07 dated 26.11.2025, build a planning-and-procurement regime on top of the existing licence conditions of Bihar's distribution licensees, extending to the whole State and taking effect on Gazette notification (p1).

Chapters 1–2 (p1–3) set the title, extent, commencement, the objective of reliably meeting projected demand at least cost, the entities covered, and the four-step framework the regulations operationalise: demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance.

Chapter 3 (p3–6) makes the distribution licensee responsible for consumer-category demand and energy forecasts — methodologies, statistical selection tests, policy and driver adjustments, loss trajectory, peak demand conversion and sensitivity scenarios — plus short-term hourly/sub-hourly forecasting; SLDC and STU then aggregate state-level forecasts and pass them to the Authority, NLDC and RLDC.

Chapter 4 (p6–9) governs generation resource planning: mapping existing, upcoming and retiring contracted resources, computing capacity credits, setting a planning reserve margin against reliability indices, and deriving the resource gap that becomes the licensee's long-term and short-term resource adequacy plans, guided by the national plans and allocated state shares.

Chapter 5 (p9–12) covers procurement planning — least-cost optimisation of the resource mix, sequencing of procurement within the State, region and across regions, lead times before the year of requirement, annual rolling plans, surplus-capacity management, and Commission approval of the plans. Chapter 6 (p12) provides monitoring and a non-compliance charge for shortfall. Chapter 7 (p12–13) sets data-sharing duties and the annual filing calendar; Chapter 8 (p14) gives the Commission powers of direction, relaxation and removal of difficulties, and repeals the 2018 power purchase and procurement process regulations with a savings clause.

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Energy storage deployment

Read with this

Other copies of these documents (1)

Proposed changes (drafts with no final yet)

Earlier drafts

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document