BERC · Bihar Electricity Regulatory Commission
Framework for Resource Adequacy Regulations, 2025
Bihar Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025
Regulation · Gazette copyDated 26 Nov 2025Published in the Gazette 22 Dec 2025No. BERC Case No. 28/2025-07 dated The 26th November 2025
The Gazette copy of the Framework for Resource Adequacy Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Bihar Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025 is a principal State regulation issued by BERC under the Electricity Act, 2003 and published in the Bihar Gazette Extraordinary. It applies across Bihar to generating companies, distribution licensees, SLDC, STU and other grid-connected entities (p1–2). Its purpose is to operationalise a resource adequacy framework: forecast demand, plan generation resources, procure capacity and monitor compliance so load is served reliably at least cost (p1–2).
Chapter 1 covers title, extent, commencement, objective, applicability and definitions, including capacity credit, EENS, LOLP, NENS, planning reserve margin and LT-DRAP/ST-DRAP (p1–3). Chapter 2 sets the overall framework and four steps: demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance (p3). Chapter 3 requires distribution licensees to prepare long-term and short-term hourly/sub-hourly demand forecasts, using stated methodologies and scenario analysis, and to submit them through SLDC/STU to the Authority, NLDC and RLDC (p3–5).
Chapter 4 governs generation resource planning: mapping existing, upcoming and retiring resources; computing capacity credit; assessing planning reserve margin against reliability indices; and identifying resource gaps to develop LT-DRAP and ST-DRAP guided by national plans (p5–7). Chapter 5 deals with procurement planning — optimal resource mix, procurement type and tenure, annual rolling plans, and management of surplus contracted capacity (p8–9). Chapter 6 provides monitoring and compliance, including reporting of state-aggregated capacity shortfall and a case-by-case non-compliance charge for failure to meet approved RA requirements (p10). Chapter 7 sets data-sharing duties and annual timelines for forecasts, plans and rolling plans (p10–11). Chapter 8 contains directions, relaxation, difficulty-removal powers and repeal of the 2018 Power Purchase and Procurement Process Regulations with savings (p11).
Read with this
The regulation
- Dated 26 Nov 2025Framework for Resource Adequacy Regulations, 2025
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 29 Jul 2025Framework for Resource Adequacy Regulations, 2025 — Draft
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.