OERC · Odisha Electricity Regulatory Commission
Licensee's Standard of Performance Regulations, 2004 — 1st Amendment, 2010
Orissa Electricity Regulatory Commission (Licensee's Standard of Performance) (1st Amendment) Regulations, 2010
AmendmentDated 16 Dec 2010No.OERC-Engg.-94/2003(Vol.-III)/ 5584 dated the16th December, 2010
Amends the Licensees' Standards of Performance Regulations, 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the 1st Amendment, 2010 to the Orissa Electricity Regulatory Commission (Licensee's Standard of Performance) Regulations, 2004 (p1). The Commission states the 2004 regulation, notified by Extraordinary Gazette Notification No.711 dated 28.05.2004, remains in force, and that it is amending it to align with a Model Standard of Performance for distribution licensees proposed by the Forum of Regulators (FOR) constituted under s.166(2) of the Electricity Act, 2003 (p1). The amendment takes effect from publication in the Official Gazette; no Gazette date is printed (p1).
Operationally, the amendment expands Regulation 3 by renumbering the existing provision as 3(1) and inserting 3(2) to 3(8). These require licensees to set up round-the-clock grievance call centres — within prescribed deadlines for urban and rural areas — to define urban and rural areas by reference (notably to a Government of Orissa notification dated 30.03.2005 on rural areas), to continue existing complaint channels until call centres exist, to staff call centres and provide a toll-free/consumer care/helpline number free of call or SMS charges, to publicise contact numbers, to maintain electronic databases linked to billing, to complete consumer indexing on deadlines, and to keep consumer-wise records of performance against guaranteed standards (p1–2).
It also inserts a new Regulation 8 on Third Party Audit, setting out who may conduct annual compliance checks, the auditor engagement procedure and conflicts of interest (p2–3); renames former Regulations 8–12 as 9–13, and amends renamed Regulation 9(1) to define Force Majeure conditions suspending the standards (p3). Finally, it adds clause 3.8 to Schedule-1 on temporary supply of power — feasibility examination, demand note, payment, energisation timings, maximum duration and the no-right-to-permanent-connection principle (p3).
Read with this
The regulation
- Dated 21 May 2004Licensees' Standards of Performance Regulations, 2004
Proposed changes (drafts with no final yet)
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.