Skip to content

OERC · Odisha Electricity Regulatory Commission

Licensee's Standard of Performance Regulations, 2004 — 1st Amendment, 2010

Orissa Electricity Regulatory Commission (Licensee's Standard of Performance) (1st Amendment) Regulations, 2010

AmendmentDated 16 Dec 2010No.OERC-Engg.-94/2003(Vol.-III)/ 5584 dated the16th December, 2010

Amends the Licensees' Standards of Performance Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the 1st Amendment, 2010 to the Orissa Electricity Regulatory Commission (Licensee's Standard of Performance) Regulations, 2004 (p1). The Commission states the 2004 regulation, notified by Extraordinary Gazette Notification No.711 dated 28.05.2004, remains in force, and that it is amending it to align with a Model Standard of Performance for distribution licensees proposed by the Forum of Regulators (FOR) constituted under s.166(2) of the Electricity Act, 2003 (p1). The amendment takes effect from publication in the Official Gazette; no Gazette date is printed (p1).

Operationally, the amendment expands Regulation 3 by renumbering the existing provision as 3(1) and inserting 3(2) to 3(8). These require licensees to set up round-the-clock grievance call centres — within prescribed deadlines for urban and rural areas — to define urban and rural areas by reference (notably to a Government of Orissa notification dated 30.03.2005 on rural areas), to continue existing complaint channels until call centres exist, to staff call centres and provide a toll-free/consumer care/helpline number free of call or SMS charges, to publicise contact numbers, to maintain electronic databases linked to billing, to complete consumer indexing on deadlines, and to keep consumer-wise records of performance against guaranteed standards (p1–2).

It also inserts a new Regulation 8 on Third Party Audit, setting out who may conduct annual compliance checks, the auditor engagement procedure and conflicts of interest (p2–3); renames former Regulations 8–12 as 9–13, and amends renamed Regulation 9(1) to define Force Majeure conditions suspending the standards (p3). Finally, it adds clause 3.8 to Schedule-1 on temporary supply of power — feasibility examination, demand note, payment, energisation timings, maximum duration and the no-right-to-permanent-connection principle (p3).

Standard name
Standards of Performance
Primary topics
Standards of performance, Consumer grievance redressal (CGRF), New connections and load changes

Read with this

The regulation

Proposed changes (drafts with no final yet)

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document