Skip to content

OERC · Odisha Electricity Regulatory Commission

Licensees' Standards of Performance Regulations, 2004

Orissa Electricity Regulatory Commission (Licensees' Standards of Performance) Regulations, 2004

RegulationDated 21 May 2004Published in the Gazette 28 May 2004No. OERC-Engg-94/2003/ dated The 21st May, 2004

1 amendment to it is on Voltaic, dated 16 Dec 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The OERC (Licensees' Standards of Performance) Regulations, 2004 set the service-quality obligations every distribution licensee and every trading licensee supplying electricity to the public in Orissa must meet, and the compensation consumers receive when those obligations are missed. The Commission issued the notification on 21 May 2004 under ss.57–59 and s.181(za)–(zb) of the Electricity Act 2003 (p2), and the regulations took effect from Gazette publication on 28 May 2004 (p2).

Regulations 1–12 (pp2–6) do the housekeeping: title, application to all distribution and trading licensees, territorial extent, commencement, definitions by voltage band, and a mandated complaint register with a serial number given to the complainant on the spot (p3). Clauses 3–7 split the standards into 'guaranteed' (Schedule I — a minimum the licensee must achieve) and 'overall' (Schedule II — targets it shall seek to achieve), make the licensee liable for compensation on guaranteed-standard failures payable within ninety days, require monthly, quarterly and annual reporting to the Commission, and put responsibility on a trading licensee using a distribution licensee's network (pp3–5). Clause 8 suspends the standards during force majeure and lets the Commission release a licensee from compensation after a hearing (p5). Clauses 9–11 give the Commission powers to issue practice directions, remove difficulties and amend; clause 12 repeals the 1998 Consumer Right to Information and Standards of Performance Regulation to the extent of overlap, preserving consumer rights under other law (p6).

Schedule I (pp7–13) specifies the guaranteed standards: restoration times for fuse-off calls, line breakdowns and transformer failure split between towns/cities and rural areas; notice and duration limits for scheduled outages; voltage-variation bands by voltage level plus complaint-resolution times; harmonic distortion stages by connection voltage, referenced to the State Grid Code; meter inspection, replacement and burnt-meter handling; and timelines for new connections, additional load, conversion and transfer of ownership, including a table of LT/11kV/33kV provisioning periods measured from payment of security (pp10–11).

Schedule II (pp14–16) sets the overall standards — percentage achievement levels for the same events, the IEEE 1366 reliability indices (SAIFI, SAIDI, MAIFI) with a prescribed computation method, frequency variation, voltage unbalance, street-light faults, billing mistakes, faulty meters and electrical accidents, with target levels left to be notified by the Commission annually. Schedule III (pp17–19) maps each guaranteed standard to a compensation amount and to automatic or claim-based payment, and sets the conditions for paying compensation.

Standard name
Standards of Performance
Primary topics
Standards of performance, Power quality, New connections and load changes

Read with this

Amendments and corrections

Proposed changes (drafts with no final yet)

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document