Distribution Licensees' Standards of Performance Regulations, 2025 — Draft

Odisha Electricity Regulatory Commission (Distribution Licensees' Standards of Performance) Regulations, 2025

Draft regulationDated 20 Aug 2025OERC.-11011(11)/1/2025-ENGG DIV-OERC/1089 dated 20.08.2025

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the pre-publication consultation package for the Odisha Electricity Regulatory Commission (Distribution Licensees' Standards of Performance) Regulations, 2025. A public notice dated 20.08.2025 states that the Commission has pre-published the draft under s.181(3) of the Electricity Act, 2003 and invites views or suggestions by 22.09.2025; after consultation, the Commission may modify the draft and finalise it for publication in the official Gazette (p1).

The Statement of Objects and Reasons explains that the 2004 SOP Regulations are being comprehensively revised to align with the Electricity (Rights of Consumers) Rules, 2020, particularly the requirement for automatic compensation for remotely monitored defaults, and with the draft revised Distribution (Conditions of Supply) Code, 2025 (p3).

The draft notification cites sections 43, 57, 58, 59, 86(1)(i) and 142 read with sections 181(1) and 182(2)(za) & (zb) of the Act (p4). Regulations 1-3 set the short title, extent to Odisha, commencement on Gazette publication, application to distribution and retail supply licensees, deemed licensees and consumers, and the objectives (pp4-8).

Regulations 4-10 establish the standards architecture: Schedule I Guaranteed Standards, Schedule II Overall Standards and Schedule III compensation; a complaint-handling manual, call centre and complaint-registration duties; consumer indexing deadlines by area; a compensation mechanism with automatic payment for specified parameters and claim-based compensation for others; penalty for non-achievement or violation; audit and grading of performance data; and reporting to the Commission (pp8-14). Regulations 11-16 cover general service obligations such as online services, doorstep services for senior citizens, outage information, cybersecurity and awareness, exemptions for force majeure and grid outages, Commission relief, powers to issue orders, remove difficulties and amend, and repeal of the 2004 Regulations with savings (pp14-17).

Schedule I specifies guaranteed standards and timelines for call centre response, restoration after fuse-off, line, cable and transformer failures, scheduled outages, meter inspection, replacement and reading, demand notes, new connections and additional load, temporary supply, shifting, transfer and conversion, billing complaints, disconnection and reconnection, power quality parameters, reliability indices and power-quality complaint redressal (pp18-30). Schedule II sets overall performance targets as percentages for many of those services, caps for faulty meters and billing mistakes, streetlight fault rectification and safety obligations (pp31-32). Schedule III gives the compensation table for failure against Schedule I parameters, with mode of compensation and computation notes (pp33-37).

Standard name
Standards of Performance
Primary topics
Standards of performance, Consumer grievance redressal (CGRF), Billing and payment

Read with this

The regulation

Amendments and corrections

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document