Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Verification of Captive Generating Plants and Captive Users Regulations, 2023 — Second Amendment, 2026

Madhya Pradesh Electricity Regulatory Commission (Verification of Captive Generating Plants and Captive Users) Regulations, 2023, Second Amendment (G-45 (ii) of 2026)

AmendmentDated 27 May 2026No. 888 /MPERC/2026 dated 27th May 2026

Amends the Verification of Captive Generating Plants and Captive Users Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page amendment by the Madhya Pradesh Electricity Regulatory Commission to its 2023 Regulations on verification of captive generating plants (CGPs) and captive users (G-45 of 2023). The stated purpose is alignment with the Ministry of Power's Electricity (Amendment) Rules, 2026, notified on 13.03.2026 (p1).

The operative content is small and mostly about expiry rather than new duties. Existing Regulation 10 is re-numbered as Regulation 11 (p1). A new Regulation 10 is inserted to sunset the Regulations themselves and the detailed CGP verification procedure published under Regulation 8, effective till 12.03.2026 (p1). Two provisos keep the designated authority (Regulation 5) and the CGP Status Dispute Resolution Committee (Regulation 9) alive till 31.03.2026, and state that pending cases are not affected (p1).

The amendment is dated 27 May 2026 and takes effect from Gazette notification; the Gazette date is not printed (p1). It extends to the whole of Madhya Pradesh (p1).

Standard name
Captive Generation Regulations
Primary topics
Captive status

Read with this

5 more documents belong here and are not on Voltaic: 3 copies in another language, 1 corrigendum and 1 corrigendum not held as English text.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document