MPERC · Madhya Pradesh Electricity Regulatory Commission
Verification of Captive Generating Plants and Captive Users Regulations, 2023
Madhya Pradesh Electricity Regulatory Commission (Verification of Captive Generating Plants and Captive Users) Regulations, 2023 (G-45 of 2023)
RegulationDated 17 Mar 2023No. 558/MPERC/2023
2 amendments to it are on Voltaic, the latest dated 27 May 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The MPERC (Verification of Captive Generating Plants and Captive Users) Regulations, 2023 (G-45 of 2023) set out how Madhya Pradesh's regulator decides, each year, whether a generating plant and the entities drawing power from it still qualify as a captive generating plant and captive users. The stated objective is to specify the methodology for that verification and the consequences of failing to meet the conditions (p1). They apply to all CGPs and captive users and extend to the whole State (p1).
The regulations are short and procedural. Regulation 1 gives the title and commencement (in force from notification in the Official Gazette); Regulations 2–3 give the objective and scope; Regulation 4 defines the core terms by reference to the Act and the Electricity Rules, 2005 (p1–2). Regulation 5 provides for a Designated Authority, to be named by a separate Commission order, which may determine status on whatever data it has if the required material is not filed, and must intimate its finding to the plant, the user and the distribution licensee by 15 July of the following year (p2).
Regulation 6 is the operative core: annual verification after the end of the financial year against two criteria — consumption and equity shareholding (p2–3). Plants and users file an affidavit by 15 May covering generation, entity-wise consumption and equity details, and the Designated Authority may call on the RLDC, SLDC and the distribution licensee for assistance (p3). Tables set the consumption test for each type of captive user — single user, partnership/LLP, association of persons, co-operative society and SPV structures — and the ownership/equity test, with the supporting certificates required for each (p3–5). They also prescribe how generation and consumption are measured when plant and user are co-located, both in-state but apart, or in different states (p3–4).
Regulation 7 states the consequence: loss of captive status for that year only, exposing the plant or user to cross-subsidy surcharge, additional surcharge and other open-access charges for the whole year, with monthly demands and a delayed-payment surcharge (p5–6). Regulation 8 leaves the detailed procedure to a future Commission publication; Regulation 9 creates a CGP Status Dispute Resolution Committee, with review before the Designated Authority, then representation to the Committee, then a petition to the Commission under the Conduct of Business Regulations, 2016 (p6). Regulation 10 is the power to remove difficulties (p6).
Read with this
Amendments and corrections
5 more documents belong here and are not on Voltaic: 3 copies in another language, 1 corrigendum and 1 corrigendum not held as English text.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.