MPERC · Madhya Pradesh Electricity Regulatory Commission
Verification of Captive Generating Plants and Captive Users Regulations, 2023 — First Amendment, 2024
Madhya Pradesh Electricity Regulatory Commission (Verification of Captive Generating Plants and Captive Users) Regulations, 2023, First Amendment (G-45 (i) of 2024)
AmendmentDated 22 Jan 2024No. 233 /MPERC/2024 dated 22<sup>th</sup> January 2024
Amends the Verification of Captive Generating Plants and Captive Users Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the first amendment to MPERC's 2023 regulations on verifying who qualifies as a captive generating plant (CGP) or captive user in Madhya Pradesh. It was issued from Bhopal on 22 January 2024 under s.181(1) read with s.9 of the Electricity Act 2003, and the stated reason is to align the state rules with the Electricity Amendment Rules 2023 notified by the Ministry of Power on 30 June and 1 September 2023 (p1).
Clause 1 gives the short title — the 2023 regulations, First Amendment (G-45 (i) of 2024) — and provides that it takes effect from notification in the Official Gazette; no Gazette date is printed (p1).
Clause 2 substitutes the objective of the principal regulations, restating that they specify the methodology for verifying captive status when consumers import power from a captive generator located in the State, and the consequences of failing either the generator or user conditions (p1). Clause 3 inserts two definitions into regulation 4.1 — Holding Company and Subsidiary Company — both borrowed from the Companies Act 2013 (p1–2).
Clause 4 replaces the whole verification-criteria table in regulation 6.4(c), which is organised by type of captive user: single captive user, partnership firm/LLP, association of persons, co-operative society, and users of a CGP set up through a special purpose vehicle. Each row is keyed to the consumption requirement, treats consumption through an Energy Storage System as admissible, and allows consumption by a holding or subsidiary company of an existing captive user to count; the association-of-persons row adds a share-proportionality tolerance (p2–3). Clause 4.2 deletes row (iii) of the table under regulation 6.4(d) without stating a replacement (p3).
Read with this
The regulation
Amendments and corrections
5 more documents belong here and are not on Voltaic: 3 copies in another language, 1 corrigendum and 1 corrigendum not held as English text.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.