The Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters)(First Amendment), Regulations, 2023.
AmendmentDated 20 Apr 2023No. RERC/Secy/ Reg. 147 dated April 20, 2023
Amends the Electricity Supply Code and Connected Matters Regulations, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the First Amendment to the Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulation, 2021, issued from Jaipur on 20 April 2023 as Notification No. RERC/Secy/Reg. 147 (p8). It applies to distribution licensees including deemed licensees, and to consumers, in Rajasthan, and comes into force from the date of publication in the official gazette (p8).
The amendment rewrites eight regulations of the Principal Regulations. Regulation 2 substitutes the supply-voltage provisions (Reg 4.4 and 4.5), specifying when 3-phase LT, single-phase LT and 11 kV supply may be given in rural areas, how the cost of the 11 kV line and the distribution transformer is split between applicant and licensee, and adding a proviso permitting 33 kV supply to new PHED connections below the usual contract-demand threshold (p8–9). Regulation 3 bars more than one industrial/non-domestic connection in the same premises in the same name unless physically and electrically separated, and makes conversion between higher and lower tariff categories permissible in both directions (p9).
Regulation 4 is the largest block, amending Reg 7 on release of connections: distance limits on LT extension for single-phase connections and the fallback to 11 kV with a new transformer, floor-area-based charging for flats and multi-storeyed development, extension of lines around RIICO industrial areas, the heading and pro-rata cost recovery for private industrial areas whose developer will not electrify, the LT/HT voltage cut-off, and the treatment of a consumer-funded dedicated feeder (p10–12).
Regulations 5 to 7 cover security-deposit exemption for RSEB/Vidyut Nigam employees, an option for HT consumers to buy rather than rent CTPT metering sets, and contract-demand reduction followed by increase, plus liability for shifting lines, including full licensee liability for hazardous lines over government school premises (p12–14). Regulation 8 amends Schedule-I: advance payments for domestic connections, per-metre charges for HT distribution mains where a new sub-station is needed, and a new clause for applicants who build the line or plant themselves and pay only supervision charges (p14–15).
Read with this
The regulation
- Dated 17 Feb 2021Electricity Supply Code and Connected Matters Regulations, 2021
Amendments and corrections
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.