Electricity Supply Code and Connected Matters, 2021 — Second Amendment Regulations, 2025

The Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) (Second Amendment), Regulations, 2025.

AmendmentDated 19 Dec 2025No. RERC/Secy/ Reg. 160 dated December 19, 2025

Amends the Electricity Supply Code and Connected Matters Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to the RERC (Electricity Supply Code and Connected Matters) Regulations, 2021, issued by the Rajasthan Electricity Regulatory Commission at Jaipur on December 19, 2025 (p12). It applies to distribution licensees, including deemed licensees, and consumers in Rajasthan, and comes into force on publication in the official gazette (p12); the gazette date is not printed.

Regulation 2 substitutes Regulation 11 of the Principal Regulations. New Regulation 11.7(d) allows outstanding dues of a permanently disconnected connection to be recovered from another existing or new connection in the same owner/occupier's name, after 30 days' notice, reply, personal hearing and a speaking order; recovery or disconnection without a speaking order is barred, and the consumer may go to the consumer grievance redressal forums (p12). New Regulation 11.8(b) sets restoration windows — HT/EHT consumers within two years and other consumers within five years from disconnection — and deems a connection permanently disconnected after that, requiring a fresh application (p13). A proviso to Regulation 11.8(d) treats reconnection applicants as new consumers after one year for HT/EHT and two years for others if the licensee has removed line material and the applicant bears line and plant cost (p13).

Regulation 3 inserts Schedule-I 2A, providing connection charges for loads up to 150 kW for domestic and non-domestic premises within 300 metres, and industrial and mixed-load premises within 200 metres, of a 24-hour three-phase LT network (p13–14). Separate tables give deposits for overhead and underground lines by consumer category (p14–16), with notes on RMU/oil-switch adjustments, supervision charges, right of way, out-of-distance and above-150 kW connections, other charges, and exclusions for developer/khatedar colonies, certain multi-storey buildings and private industrial areas (p17–18). It also renumbers the Schedule-I 2.1 and 2.2 headings and substitutes Schedule-I 2.2(a) for LT extension charges beyond the distance thresholds, with per-metre rates for single- and three-phase supply and actual-cost treatment for public street lighting (p18–19).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document