Electricity Supply Code and Connected Matters Regulations, 2021

The Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2021

RegulationDated 17 Feb 2021Published in the Gazette 25 Feb 2021No. RERC/Secy/ Reg. 139 dated February 17, 2021

3 amendments to it are on Voltaic, the latest dated 21 Jan 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software, from pages 1 to 161 of 233. Check the regulator's original before you rely on it.

This is the notification text of the Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2021 — the State's distribution-side supply code. It was issued at Jaipur on 17 February 2021 as No. RERC/Secy/Reg. 139, made under sections 43–48, 50, 55 and 56 read with section 181 of the Electricity Act 2003, and takes effect from gazette publication (p135; gazette date 25 February 2021 at p1). It applies to distribution licensees, including deemed licensees, and to consumers in Rajasthan (p135).

Chapter 1 gives the short title, applicability and commencement, and sets the process for amending the Code — suo motu or on application, with consultation of licensees and the public and publication of changes on licensee/RERC websites (p135). Chapter 2 defines roughly sixty terms and lays down rules of interpretation, falling back on the Act, the CEA metering and safety regulations, other Commission regulations and Tariff Orders where a term is undefined (p135–142). Chapter 3 fixes the character of supply — LT, HT and EHT voltage levels — and requires the licensee to stay within the frequency band of the CERC and RERC grid codes and within the voltage limits of the Standards of Performance regulations (p142–143).

Chapter 4 ties connected load and contract/actual demand to the voltage at which supply must be given, governs motive load, optional three-phase and single-phase supply, 33 kV and 132 kV thresholds and supply at a lower voltage where technical constraints exist. It also defines "variance in supply voltage" and prescribes the consequences — identification notices, transformation-loss charges, voltage rebate treatment and disconnection risks (p143–149). Chapter 5 lists the tariff categories a licensee may use and bars it from creating categories not approved by the Commission (p149).

Chapter 6 is the procedural core: application forms and online submission, acknowledgement, deficiency and cancellation timelines, priority rules, single-point supply to housing societies and employers, agreements, clearance of old arrears, shifting, temporary and construction supply, transfer/name change, change of category, and special provisions for agriculture consumers driven by State Government policy directives under section 108 (p149–157). Chapter 7 covers release of connections: timelines by area and voltage, extension of distribution mains and commissioning of substations, localities with no supply provision, and electrification of developer-built colonies, closing with design criteria for technical sanction (p157–161).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Power quality

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document