Summary
Summary written by software, from pages 1 to 161 of 233. Check the regulator's original before you rely on it.
This is the notification text of the Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2021 — the State's distribution-side supply code. It was issued at Jaipur on 17 February 2021 as No. RERC/Secy/Reg. 139, made under sections 43–48, 50, 55 and 56 read with section 181 of the Electricity Act 2003, and takes effect from gazette publication (p135; gazette date 25 February 2021 at p1). It applies to distribution licensees, including deemed licensees, and to consumers in Rajasthan (p135).
Chapter 1 gives the short title, applicability and commencement, and sets the process for amending the Code — suo motu or on application, with consultation of licensees and the public and publication of changes on licensee/RERC websites (p135). Chapter 2 defines roughly sixty terms and lays down rules of interpretation, falling back on the Act, the CEA metering and safety regulations, other Commission regulations and Tariff Orders where a term is undefined (p135–142). Chapter 3 fixes the character of supply — LT, HT and EHT voltage levels — and requires the licensee to stay within the frequency band of the CERC and RERC grid codes and within the voltage limits of the Standards of Performance regulations (p142–143).
Chapter 4 ties connected load and contract/actual demand to the voltage at which supply must be given, governs motive load, optional three-phase and single-phase supply, 33 kV and 132 kV thresholds and supply at a lower voltage where technical constraints exist. It also defines "variance in supply voltage" and prescribes the consequences — identification notices, transformation-loss charges, voltage rebate treatment and disconnection risks (p143–149). Chapter 5 lists the tariff categories a licensee may use and bars it from creating categories not approved by the Commission (p149).
Chapter 6 is the procedural core: application forms and online submission, acknowledgement, deficiency and cancellation timelines, priority rules, single-point supply to housing societies and employers, agreements, clearance of old arrears, shifting, temporary and construction supply, transfer/name change, change of category, and special provisions for agriculture consumers driven by State Government policy directives under section 108 (p149–157). Chapter 7 covers release of connections: timelines by area and voltage, extension of distribution mains and commissioning of substations, localities with no supply provision, and electrification of developer-built colonies, closing with design criteria for technical sanction (p157–161).
Read with this
Amendments and corrections
- Dated 20 Apr 2023Electricity Supply Code and Connected Matters, 2021 — First Amendment, 2023
- Dated 19 Dec 2025Electricity Supply Code and Connected Matters, 2021 — Second Amendment Regulations, 2025
- Dated 21 Jan 2026Electricity Supply Code and Connected Matters Regulations, 2021 — Third Amendment, 2026
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.