UPERC approved, on 18 March 2020, the procedure prepared by UPSLDC for forecasting, scheduling, deviation settlement and related commercial matters for solar and wind generation in Uttar Pradesh under the 2018 UPERC RE DSM Regulations (p1; p3). The order records the 2018 Regulations, UPSLDC's revised draft of 8 November 2019, a public notice of 26 November 2019, and stakeholder comments due by 18 December 2019 (p1). The procedure is to be called the 2020 Procedure although the p3 heading says 2019 (p3).
Clauses 2–4 make the Qualified Coordinating Agency (QCA) the single point of contact with SLDC for each pooling station: it submits and revises schedules, reports actual generation, coordinates metering and data, handles commercial settlement and de-pooling, maintains records, runs a control centre with forecasting tools, and indemnifies SLDC (pp3–5). SLDC does aggregate solar/wind forecasting, gives portal access, processes interface-meter data, prepares pooling-station-wise DSM and energy accounts, and maintains a separate State Deviation Settlement Account for Wind and Solar Generations (p5). Generators must appoint a registered QCA and retain block-wise injection data for three years (pp5–6).
Clauses 5–8 set QCA registration and de-registration, application documents, fees, bank guarantee/security, SLDC scrutiny timelines, and portal access (pp6–7). They also require ABT-compliant AMR interface meters, telemetry at turbine/inverter level, monthly MRI data, and daily block-wise declaration of Available Capacity, with solar AvC limited to daylight hours and mixed wind-solar plants treated pro rata (pp7–8).
Clauses 9–13 cover scheduling and despatch, revision limits and cut-offs, curtailment, deviation settlement based on the weighted average fixed rate, affidavit and PPAs, inter-state treatment under CERC DSM 2014, payment security, and a commercial-settlement timetable with late-payment interest and invocation of security (pp8–12). Clauses 14–17 deal with transmission losses/charges, SLDC fees, events of breach and consequences including show-cause and de-registration (pp12–13).
Annexures provide registration and static-data formats for QCA/wind/solar (pp14–19), day-ahead and revision schedule formats (pp20–21), telemetry and communication protocols (pp22–23, p32), registration form, enclosures, declaration and indemnification (pp24–27), generator consent letter (pp28–29), QCA undertaking (pp30–31), sample DSM bill formats (pp33–34) and illustrative scheduling/accounting cases for direct, pooled and small aggregated generators (pp35–36).
Read with this
The regulation
Commencement notices and reasons
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.