UPERC · Uttar Pradesh Electricity Regulatory Commission
Solar and Wind Forecasting, Scheduling and Deviation Settlement Regulations, 2018 — Statement of Reasons
Statement of Reasons for Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2018.
Statement of reasonsDated 28 Dec 2018
The commission's reasons for the Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation Sources Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Statement of Reasons issued by the Uttar Pradesh Electricity Regulatory Commission alongside its 2018 Regulations on forecasting, scheduling and deviation settlement for solar and wind generation sources. It is not the regulation itself: it records why the Commission framed the regime and how it dealt with consultation feedback.
Pages 1–2 set out the process. The Commission began with a suo motu hearing on 8 February 2018 to bring solar, wind and other renewable generators under the ABT regime; a draft with suggested changes to clause 3(2)(a) and clause 8 was placed on the UPERC website and publicised in Hindustan and Hindustan Times on 14 March 2018, with comments due 6 April 2018. A public hearing followed on 13 July 2018 (p1). The document lists the officials and stakeholders who attended, and the written suggestions received from Hero Future Energies, Amplus Green Power, the National Solar Energy Federation, the Chief Engineer UPSLDC and two public representatives (p1–2).
Page 2 also records operational evidence: a summary of NTPC's June 2018 forecast-error data from its Singrauli, Unchahar and Dadri solar plants, showing how time blocks were distributed across error bands. The remainder of pages 2–3 is a three-column table mapping every stakeholder submission to the Commission's viewpoint. In it the Commission accepts percentage-based deviation penalties instead of fixed per-unit rates, separate QCAs for solar and wind, turbine/inverter-level telemetry with the commercial impact of deviation borne by the QCA or generator, and a penalty where telemetry data is not submitted (p2–3). It rejects virtual pooling stations, a change to the definition of Gaming, state-level aggregation of variation, and scheduling on thermal-generation lines (p2–3).
The SoR is signed by the Chairman and two Members at Lucknow and dated 28 December 2018 (p3). It states no enabling provisions, no notification number and no commencement date.
Read with this
The regulation
Procedures and orders made under it
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.